This skill should be used when the user says "execute infra change", "run infra plan", "apply infrastructure change", "execute change", "arn infra execute", "deploy infra plan", "execute infrastructure plan", "run infrastructure change", "apply infra plan", "infra execute", "arn-infra-execute-change", or wants to orchestrate the phased execution of a structured infrastructure change plan, invoking agents for IaC generation, security gates, cost gates, deployment, verification, and review.

84

Quality

81%

Does it follow best practices?

Impact

No eval scenarios have been run

SecuritybySnyk

Risky

Do not use without reviewing

SKILL.md
Quality
Evals
Security

Arness Infra Execute Change

Orchestrate the phased execution of a structured infrastructure change plan. For each phase, this skill runs a 7-step dispatch loop: rollback checkpoint, IaC generation, security gate, cost gate, deployment, verification, and review gate. It tracks progress in PROGRESS_TRACKER.json and produces per-phase INFRA_CHANGE_REPORT_PHASE_N.json reports.

This skill consumes the structured project created by arn-infra-save-plan and coordinates all existing infrastructure agents (specialist, security-auditor, cost-analyst, verifier) plus the new change-reviewer agent.

Pipeline position:

arn-infra-init -> arn-infra-change-spec -> arn-infra-change-plan -> arn-infra-save-plan -> **arn-infra-execute-change** -> arn-infra-review-change -> arn-infra-document-change

Prerequisites

Read ## Arness from the project's CLAUDE.md. If no ## Arness section exists or Arness Infra fields are missing, inform the user: "Arness Infra is not configured for this project yet. Run /arn-infra-wizard to get started — it will set everything up automatically." Do not proceed without it.

Check the Deferred field. If Deferred: yes, inform the user: "Infrastructure is in deferred mode. Change execution is not available until infrastructure is fully configured. Run /arn-infra-assess to un-defer." Stop.

Extract:

  • Infra plans directory -- where structured plan projects live (default: .arness/infra-plans)
  • Providers -- cloud providers configured
  • Providers config -- path to providers.md
  • Environments -- environment names in promotion order
  • Environments config -- path to environments.md
  • Experience level -- derived from user profile. Read ~/.arness/user-profile.yaml (or .claude/arness-profile.local.md if it exists — project override takes precedence). Apply the experience derivation mapping from ${CLAUDE_PLUGIN_ROOT}/skills/arn-infra-ensure-config/references/experience-derivation.md. If no profile exists, check for legacy Experience level in ## Arness as fallback.
  • Cost threshold -- monthly budget limit for cost gate warnings (default: 100)
  • Default IaC tool -- default IaC tool
  • Tooling manifest -- path to tooling-manifest.json
  • Resource manifest -- path to active-resources.json

Locate the Structured Plan Project

Search for structured plan projects in the Infra plans directory:

Glob <infra-plans-dir>/*/PROGRESS_TRACKER.json

If one project found: Auto-select it. If multiple projects found: Present the list with project names and overall status from each PROGRESS_TRACKER.json. Ask the user to select. If no project found: Inform the user: "No structured plan project found. Run /arn-infra-save-plan to create one from a plan preview."

Read PROGRESS_TRACKER.json to determine current phase and execution state. If a phase is in_progress, offer to resume from the last completed step.


Workflow

Step 1: Present Execution Plan

Read the project's INTRODUCTION.md and present an execution summary:

"Infrastructure Change Execution:

  • Project: [project name]
  • Phases: [total] ([completed] completed, [remaining] remaining)
  • Current phase: [N] -- [title] (targeting [environment])
  • Blast radius: [classification for current phase]
  • Cost budget remaining: $[amount]

Proceed with Phase [N]?"

Token consumption warning: If the project has 5+ phases or 20+ resources, warn: "This is a large change with [N] phases and [M] resources. Execution will consume significant context. Consider executing one phase at a time."


Step 2: Per-Phase Dispatch Loop

Read ${CLAUDE_PLUGIN_ROOT}/skills/arn-infra-execute-change/references/dispatch-loop.md for the detailed dispatch loop logic.

For the current phase, execute the 7-step dispatch loop:

Step 2.1: Create Rollback Checkpoint

Before making any changes, create a rollback checkpoint:

  • Backup IaC state files (state pull/export)
  • Record the current resource manifest state
  • Note the checkpoint path in the phase report

Update PROGRESS_TRACKER.json: set phase execution status to in_progress.

Step 2.2: Invoke IaC Generation (arn-infra-specialist)

Read the phase plan (PHASE_N_PLAN.md) and invoke the arn-infra-specialist agent with structured context:

--- PHASE PLAN ---
[full content of PHASE_N_PLAN.md]
--- END PHASE PLAN ---

--- PROVIDER CONFIG ---
[provider configuration from providers.md]
--- END PROVIDER CONFIG ---

--- INFRASTRUCTURE CONTEXT ---
Project: [project name]
Phase: [N] of [total]
Environment: [target environment]
IaC Tool: [tool]
Blast Radius: [classification]
--- END INFRASTRUCTURE CONTEXT ---

--- GENERATION INSTRUCTIONS ---
Generate the IaC configurations for all resources listed in the phase plan.
Follow the resource specifications exactly. Use the configured IaC tool.
Generate environment-specific variable files. Include resource tagging.
--- END GENERATION INSTRUCTIONS ---

Step 2.3: Security Gate (arn-infra-security-auditor)

Read ${CLAUDE_PLUGIN_ROOT}/skills/arn-infra-execute-change/references/gate-policies.md for security gate enforcement rules.

Invoke the arn-infra-security-auditor agent to scan the generated IaC:

--- IaC ARTIFACTS ---
[list of generated files with content]
--- END IaC ARTIFACTS ---

--- SECURITY CONTEXT ---
Environment: [target environment]
Blast radius: [classification]
Security requirements: [from phase plan]
--- END SECURITY CONTEXT ---

--- SCAN INSTRUCTIONS ---
Scan the generated IaC for security issues. Report findings by severity
(CRITICAL, HIGH, MEDIUM, LOW). Check for: exposed ports, public access,
missing encryption, overly permissive IAM, hardcoded secrets.
--- END SCAN INSTRUCTIONS ---

Gate evaluation (per gate-policies.md):

  • CRITICAL findings: block execution, present findings, require fix-and-retry or abort
  • HIGH findings: present findings with risk assessment, require explicit acknowledgment
  • MEDIUM/LOW findings: log in phase report, proceed

Update PROGRESS_TRACKER.json: set securityGate.status.

Step 2.4: Cost Gate (arn-infra-cost-analyst)

Invoke the arn-infra-cost-analyst agent to estimate costs:

--- IaC ARTIFACTS ---
[generated IaC content]
--- END IaC ARTIFACTS ---

--- COST CONTEXT ---
Cost threshold: [from config]
Cumulative cost so far: [from previous phases]
Budget remaining: [total budget - cumulative]
--- END COST CONTEXT ---

--- ESTIMATION INSTRUCTIONS ---
Estimate the monthly cost for all resources in this phase.
Break down costs per resource. Compare against the threshold.
Suggest cost optimizations if threshold is exceeded.
--- END ESTIMATION INSTRUCTIONS ---

Gate evaluation (per gate-policies.md):

  • Exceeds threshold: present detailed breakdown, require acknowledgment, suggest alternatives
  • Within threshold: log estimate, proceed

Update PROGRESS_TRACKER.json: set costGate.status.

Step 2.5: Execute Deployment

Read ${CLAUDE_PLUGIN_ROOT}/skills/arn-infra-execute-change/references/deploy-procedures.md for per-tool deployment commands.

Execute the deployment using the procedures from deploy-procedures.md. Follow the same deployment flow as arn-infra-deploy:

  • Run plan/preview command
  • Present changes to user for confirmation
  • Execute apply/deploy command
  • Monitor deployment progress
  • Update resource manifest on success

User confirmation is required before every apply/deploy command.

Step 2.6: Verification (arn-infra-verifier)

Invoke the arn-infra-verifier agent to validate the deployment:

--- DEPLOYED RESOURCES ---
[list of resources from this phase]
--- END DEPLOYED RESOURCES ---

--- VERIFICATION CONTEXT ---
Environment: [target environment]
Expected endpoints: [from phase plan]
Expected resource state: [from IaC output]
--- END VERIFICATION CONTEXT ---

--- VERIFICATION INSTRUCTIONS ---
Run health checks, DNS verification, SSL validation, and resource state
comparison for all deployed resources. Report PASS/WARN/FAIL verdict.
--- END VERIFICATION INSTRUCTIONS ---

Update PROGRESS_TRACKER.json: set verification.status.

Step 2.7: Review Gate (arn-infra-change-reviewer)

Invoke the arn-infra-change-reviewer agent for a phase-level review:

--- PHASE REPORT ---
[INFRA_CHANGE_REPORT content for this phase]
--- END PHASE REPORT ---

--- CHANGE SPEC ---
[original spec content]
--- END CHANGE SPEC ---

--- REVIEW INSTRUCTIONS ---
Review this single phase for security posture, cost compliance, blast radius
adherence, and rollback documentation. Provide a phase-level verdict.
--- END REVIEW INSTRUCTIONS ---

Update PROGRESS_TRACKER.json: set review.verdict.


Step 3: Write Phase Report

After the dispatch loop completes:

Read the report template: Read ${CLAUDE_PLUGIN_ROOT}/skills/arn-infra-save-plan/report-templates/default/INFRA_CHANGE_REPORT_TEMPLATE.json

Write INFRA_CHANGE_REPORT_PHASE_N.json to the project's reports/ directory using the loaded template schema.

Update PROGRESS_TRACKER.json:

  • Set phase execution status to completed (or failed / rolled_back)
  • Update lastUpdated timestamp
  • If all phases complete, set overallStatus to completed

Step 4: Environment Promotion Gate

If the next phase targets a different environment:

"Environment Promotion: Phase [N] ([current-env]) is complete. Phase [N+1] targets [next-env].

Phase [N] Summary:

  • Resources: [N] created, [N] modified, [N] destroyed
  • Security gate: [status]
  • Cost gate: [status]
  • Verification: [status]
  • Review verdict: [verdict]

Ask (using AskUserQuestion):

"Promote to [next-env]? This requires explicit approval."

Options:

  1. Yes -- Promote to [next-env] and continue execution
  2. No -- Stop execution here

User approval is required for every environment promotion. Never auto-promote.


Step 5: Continue or Complete

If more phases remain: Return to Step 2 for the next phase.

If all phases complete: Present the final summary:

"Infrastructure Change Complete:

  • Project: [name]
  • Phases executed: [N]
  • Resources provisioned: [total]
  • Total estimated cost: $[amount]/month
  • Overall review verdict: [pass/warn/needs-fixes]

Next steps:

  1. Full review -- Run /arn-infra-review-change for a comprehensive cross-phase review
  2. Documentation -- Run /arn-infra-document-change to generate runbooks and changelog
  3. Monitor -- Run /arn-infra-monitor to set up observability"

Parallel Batch Execution

For parallel execution of independent resources within the same environment, see the dispatch loop reference.


Error Handling

  • ## Arness config missing: Suggest running /arn-infra-wizard to get started. Stop.
  • Plan project not found: Suggest running /arn-infra-save-plan to create a structured project. Stop.
  • PROGRESS_TRACKER.json missing or corrupt: Offer to regenerate from the phase plans. If the user agrees, scan the plans/ directory and rebuild the tracker.
  • Agent invocation fails: Report the error. Offer to retry the agent, skip the step (with warning), or abort execution. If aborting, trigger rollback for the current phase.
  • Security gate blocks: Present the CRITICAL findings. Options: (1) Fix the IaC and retry, (2) Abort and rollback, (3) Do not offer "acknowledge and proceed" for CRITICAL findings.
  • Cost gate exceeds threshold: Present the cost breakdown. Options: (1) Acknowledge and proceed, (2) Fix the configuration to reduce costs and retry, (3) Abort execution.
  • Deployment fails: Capture error output. Offer: (1) Retry deployment, (2) Rollback using checkpoint, (3) Abort and leave current state. Update PROGRESS_TRACKER.json with failure status.
  • Verification fails: Present the verification report. Offer: (1) Investigate and fix, (2) Rollback the phase, (3) Acknowledge and proceed (with warning logged).
  • Environment promotion denied: Stop execution. The project remains in its current state. The user can resume later.
  • Resume from interruption: Detect the last completed step from PROGRESS_TRACKER.json. Present: "Execution was interrupted at Phase [N], Step [step]. Resume from [next step]?" If yes, continue from the interrupted point. If no, offer to restart the phase.
  • Re-running is safe: Re-running re-reads PROGRESS_TRACKER.json and resumes from the first incomplete phase. Completed phases are not re-executed unless the user explicitly requests it.