Content
66%Weight 40%Scale 1-5Reviews the quality of instructions and guidance provided to agents. Good implementation is clear, handles edge cases, and produces reliable results.
The body excels at workflow clarity with gated phases and escalation, and it organizes content well as an overview pointing to per-phase references. Its weaknesses are triple-listing of the phases (conciseness) and deferring most executable detail to phase files that are not present in the bundle (actionability).
Suggestions
Consolidate the three phase listings — keep either the ASCII architecture diagram or the Execution Flow list, and let the Reference Documents table carry navigation, to remove redundancy.
Inline at least one fully executable phase (e.g. the version-bump commands for npm/Python/generic) so the body is actionable on its own when the phase files are not bundled.
Ensure the referenced phases/*.md and ../_shared/SKILL-DESIGN-SPEC.md files ship with the skill, or note their absence, so the progressive-disclosure references resolve.
| Dimension | Reasoning | Score |
|---|---|---|
Conciseness | The body is mostly lean and assumes Claude's competence, but the seven phases are restated three times — the ASCII architecture diagram, the 'Execution Flow' numbered list, and the 'Reference Documents' table — which is redundant padding that could be tightened. | 3 / 5 |
Actionability | The Pre-Flight Checklist table gives concrete, executable commands with pass conditions, but the detailed per-phase steps are deferred to the phase reference files, so the body's own guidance is incomplete rather than copy-paste ready. | 3 / 5 |
Workflow Clarity | A clear seven-phase sequence with an explicit gate per phase ('Each phase must pass before the next begins'), a pre-flight checklist, and a three-strike escalation feedback loop for error recovery, matching the score-5 anchor; validation is present so the destructive-operation cap does not apply. | 5 / 5 |
Progressive Disclosure | The overview is well structured with one-level-deep references signaled clearly via the 'Reference Documents' table, but the referenced phase files and shared spec are absent from the bundle, so the split cannot be fully verified. | 4 / 5 |
Total | 15 / 20 Passed |