Generates phased plans or step-by-step task lists in Markdown from a PRD or feature description. Tasks include checkboxes, relevant file paths, test commands, YARD documentation, and code-review gates for Rails-oriented workflows.

78

Quality

72%

Does it follow best practices?

Impact

Pending

No eval scenarios have been run

SecuritybySnyk

Passed

No known issues

Optimize this skill with Tessl

npx tessl skill review --optimize ./generate-tasks/SKILL.md
SKILL.md
Quality
Evals
Security

Generating a Task List from Requirements

Goal

Create a phased plan or step-by-step task list in Markdown that guides a developer through implementing a feature. Tasks should be actionable, ordered, and tied to the requirements.

Core principle: Match the output to the request. Strategy requests get a phased plan; implementation requests get detailed 2-5 minute tasks.

Quick Reference

StepActionOutput
1Receive PRD or feature descriptionRaw requirements
2Detect project/work typeMonolith, engine, API-only, integration
3Choose output modePhased plan or detailed checklist
4Generate parent phases/tasksHigh-level structure
5Wait for "Go" (default) or generate allUser confirmation
6Generate sub-tasks with exact file pathsDetailed checklist
7Save to /tasks/tasks-[feature-name].md
8Include completion phaseYARD, docs, self-review tasks

HARD-GATE

Task 0.0 is ALWAYS "Create feature branch" unless user explicitly says otherwise.
Each sub-task MUST be a single, clear action completable in 2-5 minutes.
Sub-tasks MUST include exact file paths, not vague references.
DO NOT skip the verification step after saving.

TESTS GATE IMPLEMENTATION:
  The test is a GATE — implementation CANNOT proceed until the test:
    1. EXISTS (written and saved)
    2. Has been RUN
    3. FAILS for the correct reason (feature missing)

  Structure sub-tasks as:
    a) "Write spec for X" (with exact file path)
    b) "Run spec — verify it fails because X does not exist yet"
    c) "Implement X to pass spec" (with exact file path)
    d) "Run spec — verify it passes"

  NEVER generate a task that writes implementation before its test.
  NEVER skip the "run and verify failure" step between test and implementation.

OUTPUT MODE:
  If the user asks for strategy, sequencing, phases, or approach, produce a phased plan first.
  If the user asks for implementation tasks, checklist, or exact steps, produce the detailed mode.

POST-IMPLEMENTATION GATE (always include as explicit parent tasks after tests pass):

  Every task list that adds or changes production Ruby/Rails code MUST end with:

  1. YARD — Document every new or changed public class and public method
     (skill: yard-documentation). Sub-tasks must name each file to document.

  2. Documentation — Update README, architecture/diagrams (e.g. Mermaid, ADRs),
     and any domain docs touched by the change. List concrete paths in
     "Relevant Files" and as sub-tasks (create diagram updates if behavior
     or data flow changed).

  3. Code review — Self-review the full diff using rails-code-review (and
     rails-security-review / rails-architecture-review when scope warrants).
     Sub-tasks: run through review checklist, fix blocking issues, then open PR
     (or hand off for human review). Do not treat "implementation done" as
     complete without this step.

When to Use

  • User asks for tasks, task list, implementation checklist, or to "break down" a feature.
  • User asks for sequencing, implementation phases, or strategy from a PRD.
  • User points to an existing PRD and wants implementation steps.
  • Input: A PRD file, a feature description, or a link to requirements. If a PRD exists, derive tasks from its Functional Requirements and Goals first.

Process

  1. Receive requirements: User provides a feature description, task request, or path to a PRD (e.g. tasks/prd-[feature-name].md).
  2. Analyze: If a PRD is given, extract Functional Requirements and Goals. Otherwise use the feature description. Identify scope and main work areas.
  3. Detect work type: Call out whether the work is mainly a Rails monolith change, engine change, API-only surface, background job flow, or external integration. This affects spec selection, file paths, and follow-up skills.
  4. Choose output mode:
    • Phased plan: If the user is asking for strategy, sequencing, or architecture-level planning, generate phases with goals, likely files, and decision points.
    • Detailed checklist (default for implementation): Generate parent tasks and then sub-tasks with exact file paths.
  5. Choose flow for detailed mode:
    • Default (with pause): Generate only parent tasks (~5 high-level tasks). Present them and say: "I've generated the high-level tasks. Reply Go to generate sub-tasks, or tell me what to change."
    • One shot: If the user said "todo junto", "all at once", "sin pausa", "no pause", "generate everything", or similar, generate parent tasks and sub-tasks in a single pass and save the full file. Do not wait for "Go".
  6. Parent tasks/phases: Always include 0.0 Create feature branch as the first task unless the user asks otherwise. After implementation parents, always add parents for YARD, documentation (README, diagrams, related docs), and code review (self-review + PR readiness). Typical order: setup -> tests/specs -> implementation -> YARD -> docs -> review.
  7. Sub-tasks: For each parent, break down into small, concrete steps. One sub-task = one clear action. Order so that dependencies are respected. Include exact file paths. Documentation sub-tasks must name real paths (e.g. docs/telematics.md, README.md, doc/architecture/*.md) or state "add diagram under docs/..." when the repo layout is unknown.
  8. Relevant Files: List files that will likely be created or modified (including tests, README, diagrams, and internal docs). Refine this list when generating sub-tasks. Infer test command from the project when possible (e.g. Gemfile -> bundle exec rspec, package.json scripts -> npm test or npx jest). For style checks, name the project linter command if the repo defines one.
  9. Save: Save as tasks-[feature-name].md in /tasks/. Use the same [feature-name] as the PRD if one was provided.
  10. Verify: Re-read the saved file and confirm the task count and structure match expectations.

Rails-First Slice Heuristics

Use the smallest slice that proves behavior at the right boundary:

Change typeDefault first slice
New endpoint or controller behaviorRequest spec -> controller/service wiring -> persistence/docs
New service or domain ruleService or model spec -> implementation -> callers/docs
Background workJob spec -> service/domain spec if logic is substantial
External integrationClient/fetcher layer spec -> builder/domain mapping -> callers
Rails engine workEngine request/routing/generator spec -> engine code -> install/docs
Bug fixHighest-value reproducing spec at the boundary where users feel the bug

When in doubt, prefer the highest-value failing spec that proves the user-visible behavior before descending into lower-level units.

Output Format

Use one of these structures depending on the request.

Detailed Checklist

The detailed task list must follow this structure:

# Task List: [Feature Name]

Based on: `prd-[feature-name].md` *(only if PRD was the source)*

## Relevant Files

- `path/to/file1.ext` - Why this file is relevant.
- `path/to/file1.spec.ext` (or `.test.ext`) - Tests for file1.
- `path/to/file2.ext` - Why this file is relevant.

### Notes

- Tests live next to or mirror the code they cover.
- Run tests: `[project\'s test command]` *(replace with project's test command)*
- After green tests: add YARD on public Ruby API, update README/diagrams/docs as needed, then self code review before PR.

## Instructions for Completing Tasks

Check off each task when done: change `- [ ]` to `- [x]`. Update the file after each sub-task, not only after a full parent task.

## Tasks

- [ ] 0.0 Create feature branch
  - [ ] 0.1 Create and checkout branch (e.g. `git checkout -b feature/[feature-name]`)
- [ ] 1.0 [Parent task title]
  - [ ] 1.1 Write spec for [behavior] (`spec/path/to/spec.rb`)
  - [ ] 1.2 Run spec — verify it fails (feature does not exist yet)
  - [ ] 1.3 Implement [behavior] to pass spec (`app/path/to/file.rb`)
  - [ ] 1.4 Run spec — verify it passes and no other tests break
- [ ] 2.0 [Parent task title]
  - [ ] 2.1 Write spec for [behavior] (`spec/path/to/spec.rb`)
  - [ ] 2.2 Run spec — verify it fails (feature does not exist yet)
  - [ ] 2.3 Implement [behavior] to pass spec (`app/path/to/file.rb`)
  - [ ] 2.4 Run spec — verify it passes
- [ ] 3.0 YARD and public API documentation
  - [ ] 3.1 Add YARD to new/changed public classes and methods (`app/path/to/file.rb`) — English only
  - [ ] 3.2 Run `yard doc` or project doc task if applicable — fix warnings on touched files
- [ ] 4.0 Update documentation artifacts
  - [ ] 4.1 Update README or module README if behavior or setup changed (`README.md` or `docs/...`)
  - [ ] 4.2 Update diagrams or architecture docs if flows or boundaries changed (`docs/...`, ADRs)
- [ ] 5.0 Code review before merge
  - [ ] 5.1 Self-review full diff (rails-code-review checklist); fix Critical/Suggestion items
  - [ ] 5.2 Security/architecture pass if scope warrants (rails-security-review, rails-architecture-review)
  - [ ] 5.3 Open PR or request review — attach summary of doc/YARD updates

Phased Plan

Use this lighter structure when the user asks for sequencing or strategy rather than a full checklist:

# Implementation Plan: [Feature Name]

Based on: `prd-[feature-name].md` *(only if PRD was the source)*

## Work Type

- Rails monolith / engine / API-only / external integration

## Phases

### Phase 1: [Goal]
- Target behavior:
- First failing spec:
- Likely files:
- Dependencies / decisions:

### Phase 2: [Goal]
- Target behavior:
- First failing spec:
- Likely files:
- Dependencies / decisions:

## Completion

- YARD updates
- README / diagrams / docs updates
- Self-review with follow-up skills

Interaction Model

  • Phased mode: Use when the user asks for strategy, phases, or sequencing. Save the phased plan directly unless the user wants iteration first.
  • With pause: In detailed mode, after showing parent tasks, wait for "Go" (or user corrections) before generating and saving the full list with sub-tasks.
  • Without pause: If the user requested everything in one go, generate and save the complete detailed list immediately.

Target Audience

Write for a junior developer: each sub-task should be a single, clear action they can complete and check off without ambiguity.

Common Mistakes

MistakeReality
Vague sub-tasks ("set up the backend")Each sub-task must name the exact file and action
Forcing a detailed checklist when the user asked for strategyUse phased mode for sequencing and architectural planning
Tasks without file pathsAlways include the file path being created or modified
Tasks that take 30+ minutesBreak down further — target 2-5 minutes per sub-task
Skipping task 0.0 (feature branch)Always start with branch creation unless user says otherwise
Generating all at once by defaultDefault is pause after parent tasks. Only skip pause when user asks
No test command in relevant filesInfer from project (Gemfile, package.json, etc.)
Choosing low-level unit tasks first for an API or UI-facing changeStart at the boundary that proves the behavior, then move inward
Dependencies out of orderA task should never reference something created in a later task

Red Flags

  • Sub-task contains "and" (likely two tasks combined)
  • No test files listed in relevant files
  • Implementation/test parent tasks exceed ~7 (scope too large — suggest phased task files; YARD/docs/review parents are expected)
  • Strategy request answered with a giant checklist instead of phases
  • Sub-task says "update as needed" or "configure appropriately" (too vague)
  • Task list generated without reading the PRD first
  • Implementation started before task list was reviewed
  • Task list ends at "tests pass" with no YARD, docs, or code-review parents — incomplete; add completion parents
  • No README/diagram/doc paths in Relevant Files when integrators or operators need updates

Integration

SkillWhen to chain
create-prdGenerate PRD first, then derive tasks from it
rails-tdd-slicesWhen planning the best first failing spec or vertical slice for a Rails change
rails-stack-conventionsWhen generating tasks for a Rails feature
ticket-planningWhen the user also wants Jira ticket drafts or board placement from the same initiative
rspec-best-practicesWhen generating test-related tasks
rails-bug-triageWhen the request starts from a bug report and needs reproduction plus sequencing
refactor-safelyWhen tasks involve refactoring existing code
yard-documentationAfter implementation — sub-tasks under the YARD parent
rails-code-reviewFinal parent — self-review full diff before PR
rails-security-reviewWhen tasks touch auth, params, external IO, or sensitive data
rails-architecture-reviewWhen boundaries, domains, or structure shift
rails-engine-docsWhen the change affects a Rails engine's install or public API
Repository
igmarin/rails-agent-skills
Last updated
Created

Is this your skill?

If you maintain this skill, you can claim it as your own. Once claimed, you can manage eval scenarios, bundle related skills, attach documentation or rules, and ensure cross-agent compatibility.