New or updated sprint plan from the current milestone, completed work, and available capacity.
72%
Does it follow best practices?
Run evals on this skill
Adds up to 20 points to the overall score
Passed
No findings from the security scan
Fix and improve this skill with Tessl
tessl review fix ./.claude/skills/sprint-plan/SKILL.md!bash "${CLAUDE_SKILL_DIR}/../../hooks/yaml-helper.sh" resolve_config --keys review_mode,automation,story_granularity,workflow
Resolved above — use as-is; --review overrides review_mode. No block →
defaults in .claude/docs/config-resolution.md.
!ls production/sprints/ 2>/dev/null || echo "(no production/sprints/ directory yet)"
Resolved before this skill runs — use it to identify the previous sprint in Phase 1 rather than re-globbing.
Extract the mode argument (new, update, or status).
See .claude/docs/director-gates.md for the full check pattern. Individual gate definitions live in .claude/docs/director-gates/[gate-id].md — the spawned agent reads its own gate file; do not read it in the parent session.
Every AskUserQuestion call follows .claude/docs/automation-modes.md
(collaborative asks always · guided major-only · autonomous logs and proceeds;
automation_always_ask categories always prompt).
story_granularity — it sets how
many stories to allocate per sprint, scaled by velocity: 2–4 at coarse (the default, via rigor: minimal),
6–10 at balanced (rigor: standard), 15–25 at fine. A Ready backlog
smaller than the range is planned whole — never padded with invented stories.
Review mode check (before gates run):
--review overrides it
for this run) — do not re-resolve it, and do not ask for it. With nothing
configured it follows modes.rigor: solo at minimal, lean at standard.project.yaml, not to
production/review-mode.txt. modes.review_mode is one of the knobs
modes.rigor fronts: pinning it in project.yaml shadows the rigor
expansion, and the legacy file sits above that expansion, so either write
would freeze director-review depth for good. --review covers a one-off. If
the user wants a different depth to persist, point them to changing
modes.rigor (/project-settings modes.rigor=<minimal|standard|full>), or to pinning
it on purpose with /project-settings --local modes.review_mode=<full|lean|solo> (a
personal override in project.local.yaml).Read the current milestone from production/milestones/ if it exists.
No skill writes this directory — it is authored by hand from
.claude/docs/templates/milestone-definition.md. On the majority of projects
it is absent, which is the normal state, not a gap: note "no milestone
defined — planning against the story backlog alone" and continue. Never block
sprint planning on it, and never infer a milestone from the sprint files.
Read the previous sprint (if any) from production/sprints/ to
understand velocity and carryover. In new mode:
[N] is the highest sprint-NNN.md in the
Existing Sprints listing plus one (001 when there is none). It is the
[N] in the plan's title, its QA plan path and the write ask.Complete — by its status
in production/sprint-status.yaml, else its story file's Status line —
goes in the Carryover table with a Reason and a New Estimate. It appears
only there, never again as new Must Have / Should Have / Nice to Have work.Find the stories to plan — this is the actual backlog, and it is the one input this phase cannot do without:
Glob production/epics/**/story-*.md
Grep pattern="^> \*\*Status\*\*" glob="production/epics/**/story-*.md" output_mode="content"Stories live at production/epics/[epic-slug]/story-NNN-[slug].md — that is
where /create-stories writes them and where /dev-story looks for them. Plan
from the ones marked Ready. Use the grep rather than reading each story: at
this stage you need status and title, not the body.
If the glob returns nothing: "No stories found under production/epics/. Run
/create-stories first (at standard/full, /create-epics before it)."
Do not proceed to invent work items — a sprint plan that references stories
which do not exist cannot be implemented. Verdict: BLOCKED — no stories to plan.
Scan design documents in design/gdd/ for additional context on the
features those stories implement. Read each by section: find the headings you
need with the Grep tool (pattern ^#, content mode) and Read those ranges
with offset and limit. At workflow: minimal there are no
per-system GDDs — use design/game-brief.md instead, and do not treat the
absent GDDs as missing work. (Note: /sprint-plan is optional at
minimal — the brief's Build order already is the plan.)
Check the risk register at production/risk-register/ if it exists.
Like the milestone above, no skill writes it — entries are authored by hand
from .claude/docs/templates/risk-register-entry.md. If the directory is
absent, say so once ("no risk register — risks assessed from the sprint
contents only") rather than skipping risk assessment silently.
For new:
Generate a sprint plan following this format and present it to the user. Do not ask to write yet — the gate phases run first and may require revisions before the file is written: the producer feasibility gate (Phase 4, spawned only in full review mode — skipped in lean/solo) and the QA plan check (Phase 5, all modes).
# Sprint [N] — [Start Date] to [End Date]
## Sprint Goal
[One sentence describing what this sprint achieves toward the milestone]
## Goal Prerequisites
| Needed to show the goal | Status |
|-------------------------|--------|
## Capacity
- Total days: [X]
- Buffer (20%): [Y days reserved for unplanned work]
- Available: [Z days]
## Tasks
### Must Have (Critical Path)
| ID | Task | Agent/Owner | Est. Days | Dependencies | Acceptance Criteria |
|----|------|-------------|-----------|-------------|-------------------|
### Should Have
| ID | Task | Agent/Owner | Est. Days | Dependencies | Acceptance Criteria |
|----|------|-------------|-----------|-------------|-------------------|
### Nice to Have
| ID | Task | Agent/Owner | Est. Days | Dependencies | Acceptance Criteria |
|----|------|-------------|-----------|-------------|-------------------|
## Carryover from Previous Sprint
| Task | Reason | New Estimate |
|------|--------|-------------|
## Risks
| Risk | Probability | Impact | Mitigation |
|------|------------|--------|------------|
## Dependencies on External Factors
- [List any external dependencies]
## Definition of Done for this Sprint
- [ ] All Must Have tasks completed
- [ ] All tasks pass acceptance criteria
- [ ] QA plan exists (`production/qa/qa-plan-[sprint-slug]-[date].md`, from `/qa-plan sprint`)
- [ ] All Logic/Integration stories have passing unit/integration tests
- [ ] Smoke check passed (`/smoke-check sprint`)
- [ ] QA sign-off report: APPROVED or APPROVED WITH CONDITIONS (`/team-qa sprint`)
- [ ] No S1 or S2 bugs in delivered features
- [ ] Design documents updated for any deviations
- [ ] Code reviewed and mergedBefore you present a new plan, check that its goal can be shown working by the
sprint's end. A goal can need something no story builds: a playtest needs a
scene to run in. This check reports and never blocks. It adds no question and no
story of its own.
run/main_scene in project.godot,
the scene list in Unity's ProjectSettings/EditorBuildSettings.asset, or
GameDefaultMap in Unreal's Config/DefaultEngine.ini. Add any file, scene
or system that a picked story's acceptance criteria, notes or dependencies
name and no picked story creates. A goal with nothing to run or show (logic
and tests only) needs none.engine.name in
project.yaml): *.tscn for Godot, Assets/**/*.unity for Unity,
Content/**/*.umap for Unreal. Find anything else by the path or name the
stories use. With no engine set, check by name only and say the scene search
did not run.exists,
built by [story ID] or missing, or the single row "None: the goal has
nothing to run or show". Copy each missing one into Risks. When you present
the plan, name each missing one and the three fixes open to the user: pull in
the Ready story that builds it (name it, and say if that takes the sprint past
its story_granularity range or needs stories it depends on), write a story
for it first with /create-stories, or reword the goal to promise only what
the sprint can show. Give them as part of the plan,
not as a question: the write ask stays the only question, and a user who
wants a fix says so in reply to it. Report the gap; do not solve it. A
missing prerequisite stays missing in this plan, however small it looks (a
flat test level, an input map): plan no task for it and put none of its work
into a picked story, not even as setup. Its work needs a story first, which
is /create-stories' job. Never add a story the backlog does not
hold, and never widen a picked story or edit a story file to cover the gap.For update:
Update an existing sprint plan:
production/sprints/.production/sprint-status.yaml.AskUserQuestion to gather changes.new mode).Note: update mode does not reset story statuses. Stories already marked in-progress or done keep their status. Only backlog and ready-for-dev stories can be removed or reprioritized freely.
For status:
Generate a status report:
# Sprint [N] Status -- [Date]
## Progress: [X/Y tasks complete] ([Z%])
### Completed
| Task | Completed By | Notes |
|------|-------------|-------|
### In Progress
| Task | Owner | % Done | Blockers |
|------|-------|--------|----------|
### Not Started
| Task | Owner | At Risk? | Notes |
|------|-------|----------|-------|
### Blocked
| Task | Blocker | Owner of Blocker | ETA |
|------|---------|-----------------|-----|
## Burndown Assessment
[On track / Behind / Ahead]
[If behind: What is being cut or deferred]
## Emerging Risks
- [Any new risks identified this sprint]After generating a new sprint plan, also prepare the production/sprint-status.yaml content.
This is the machine-readable source of truth for story status — read by
/sprint-status, /story-done, and /next-step without markdown parsing.
Do not write the yaml yet — hold it in context. The producer feasibility gate (Phase 4, full review mode only) may revise the story list; the QA plan check (Phase 5) runs in every mode. Both files are written together after Phase 5 in a single write approval.
Format:
# Auto-generated by /sprint-plan. Updated by /story-done and /dev-story.
# DO NOT edit manually — use /story-done to update story status.
#
# Status value mapping (yaml ↔ story file Status field):
# backlog ↔ Not Started
# ready-for-dev ↔ Ready
# in-progress ↔ In Progress
# review ↔ In Review
# done ↔ Complete
# blocked ↔ Blocked
sprint: [N]
goal: "[sprint goal]"
start: "[YYYY-MM-DD]"
end: "[YYYY-MM-DD]"
generated: "[YYYY-MM-DD]"
updated: "[YYYY-MM-DD]"
stories:
- id: "[epic-story, e.g. 1-1]"
name: "[story name]"
file: "[production/epics/[epic-slug]/story-NNN-[slug].md]" # the real path, verbatim from the Glob above
priority: must-have # must-have | should-have | nice-to-have
status: ready-for-dev # backlog | ready-for-dev | in-progress | review | done | blocked
owner: ""
estimate_days: 0
blocker: ""
completed: ""Initialize each story from the sprint plan's task tables:
priority: must-have, status: ready-for-devpriority: should-have, status: backlogpriority: nice-to-have, status: backlogpriority, and the status it has nowFor update: read the existing sprint-status.yaml, carry over statuses for
stories that haven't changed, add new stories, remove dropped ones.
Review mode check — apply before spawning PR-SPRINT:
solo → skip. Note: "PR-SPRINT skipped — Solo mode." Proceed to Phase 5 (QA plan gate).lean → skip (not a PHASE-GATE). Note: "PR-SPRINT skipped — Lean mode." Proceed to Phase 5 (QA plan gate).full → spawn as normal.Before finalising the sprint plan, spawn producer via Agent using gate PR-SPRINT (.claude/docs/director-gates/pr-sprint.md).
Pass: proposed story list (titles, estimates, dependencies), total team capacity in hours/days, any carryover from the previous sprint, milestone constraints and deadline, and any missing goal prerequisite.
Present the producer's assessment.
If UNREALISTIC: revise the story selection (defer stories to Should Have or Nice to Have) and re-present the updated plan, then continue to Phase 5.
If NOT ASSESSED: name the missing input — it is not REALISTIC. Supply it and re-run PR-SPRINT, or record NOT ASSESSED — [missing input] for PR-SPRINT in the plan's header (.claude/docs/director-gates.md) and continue to Phase 5, repeating it at the write ask.
If CONCERNS, use AskUserQuestion:
[A] Proceed as planned — I accept the risk[B] Adjust scope — defer some Should Have stories[C] Extend the sprint timelineIf [A]: continue to Phase 5. If [B]: revise the story list, re-present the updated plan, then continue to Phase 5. If [C]: adjust sprint dates and capacity, re-present the updated plan, then continue to Phase 5.
After handling the producer's verdict, continue to Phase 5. The write comes at its end, so the file you approve already holds everything Phase 5 adds.
Before closing the sprint plan, check whether a QA plan exists for this sprint.
Use Glob for production/qa/qa-plan-*.md — /qa-plan writes qa-plan-[sprint-slug]-[date].md — and keep a file whose name or content references this sprint number.
If a QA plan is found: note it in the sprint plan output — "QA Plan: [path]" — and proceed.
If no QA plan exists: do not silently proceed. Surface this explicitly:
"This sprint has no QA plan. A sprint plan without a QA plan means test requirements are undefined — developers won't know what 'done' looks like from a QA perspective, and the sprint cannot pass the Production → Polish gate without one.
Run
/qa-plan sprintnow, before starting any implementation. It takes one session and produces the test case requirements each story needs."
Use AskUserQuestion:
[A] Run /qa-plan sprint now — I'll do that before starting implementation (Recommended)[B] Skip for now — I understand QA sign-off will be blocked at the Production → Polish gateWait for this answer before the write ask below — the two are separate questions. An answer here is never approval to write, even "yes, go ahead" or "once the plan is written": ask the write question next and write only after a yes to it.
If [A]: note in the plan "QA plan: run /qa-plan sprint before implementation begins."
If [B]: add a warning block to the sprint plan document:
> ⚠️ **No QA Plan**: This sprint was started without a QA plan. Run `/qa-plan sprint`
> before the last story is implemented. The Production → Polish gate requires a QA
> sign-off report, which requires a QA plan.Ask: "May I write the sprint plan to production/sprints/sprint-NNN.md ([N] zero-padded to three digits) and
production/sprint-status.yaml?" Ask it even when an earlier answer sounded like a yes. If yes, write both files (creating directories as
needed). Verdict: COMPLETE — sprint plan and status file created. If no:
Verdict: BLOCKED — user declined write.
After writing, add:
Scope check: If this sprint includes stories added beyond the original epic scope, run
/scope-check [epic]to detect scope creep before implementation begins.
If the user chose Run /qa-plan sprint now in Phase 5, close with "Sprint plan written. Run /qa-plan sprint next — then begin implementation."
After the sprint plan is written and QA plan status is resolved:
/qa-plan sprint — required before implementation begins — defines test cases per story so developers implement against QA specs, not a blank slate/story-readiness [story-file] — validate a story is ready before starting it/dev-story [story-file] — begin implementing the first story/sprint-status — check progress mid-sprint/scope-check [epic] — verify no scope creep before implementation beginsReview mode configuration: All director gates (producer feasibility, QA review, code review) respect the project review mode, resolved in the block at the top of this skill (--review flag → project.local.yaml → modes.review_mode in project.yaml → production/review-mode.txt → the modes.rigor expansion, which yields lean at standard rigor and solo at minimal). This skill never asks for it or writes it; Phase 0 says where to point a user who wants a different depth. The mode is one of:
lean — skip non-phase-gate director gates (the rigor: standard value)full — run all director gates as spawned sub-agentssolo — skip all gate spawning unconditionally (single developer, no review)modes.review_mode in project.yaml is the primary source; production/review-mode.txt is the legacy fallback. Both are read by /sprint-plan, /story-readiness, /story-done, and other gate-using skills at startup.