Use when the user asks to "configure Jira", "set up Azure DevOps", "design PM tool workflows", "create board configuration", "map tool to methodology", or mentions Jira configuration, Azure DevOps setup, PM tool setup, workflow design, board configuration. Triggers on: designs PM tool project structure, creates workflow state machines, configures board columns and swimlanes, maps methodology ceremonies to tool features, produces tool user guides.

The canonical home for this skill is apex-jira-configuration in JaviMontano/mao-discovery-framework

SKILL.md
Quality
Evals
Security

Jira / Azure DevOps Configuration

TL;DR: Designs PM tool configuration (Jira, Azure DevOps, or equivalent) including project structure, workflow design, field configuration, board setup, automation rules, and reporting dashboards. Ensures the tool supports the selected methodology rather than constraining it.

Principio Rector

La herramienta debe servir al proceso, no al revés. Configurar Jira antes de diseñar el proceso garantiza que el proceso se adapte a las limitaciones de Jira — no a las necesidades del proyecto. Primero el proceso, luego la herramienta. La configuración correcta hace que el trabajo correcto sea el camino más fácil.

Assumptions & Limits

  • Assumes methodology selection and ceremony design are completed before tool configuration [SUPUESTO]
  • Assumes tool licensing and admin access are available or confirmed [SUPUESTO]
  • Breaks if methodology is not defined — configuring a tool without a process creates arbitrary workflows [PLAN]
  • Scope limited to configuration design; actual tool administration requires platform admin access [PLAN]
  • Does not evaluate tool selection — assumes tool is already chosen; use poc-lab for tool evaluation [PLAN]

Usage

/pm:jira-configuration $PROJECT_NAME --tool=jira --methodology=scrum
/pm:jira-configuration $PROJECT_NAME --tool=azure-devops --methodology=kanban
/pm:jira-configuration $PROJECT_NAME --tool=jira --methodology=safe --include=dashboards

Parameters:

ParameterRequiredDescription
$PROJECT_NAMEYesTarget project identifier
--toolNojira / azure-devops / monday (default: jira)
--methodologyNoscrum / kanban / safe / waterfall / hybrid
--includeNoworkflows / dashboards / automation / all (default: all)

Service Type Routing

{TIPO_PROYECTO}: Scrum uses Scrum board with sprint management; Kanban uses Kanban board with WIP limits; SAFe uses SAFe template; Waterfall uses project plan with phases; Hybrid uses combined configuration.

Before Configuring Tools

  1. Read methodology-playbook — confirm ceremonies and workflows to be supported [PLAN]
  2. Glob *ceremony* and *definition-of-done* — tool must enforce these agreements [PLAN]
  3. Read team structure — configure permissions and board views per role [STAKEHOLDER]
  4. Check reporting requirements — dashboard design must satisfy governance reporting needs [PLAN]

Entrada (Input Requirements)

  • Selected methodology and ceremony design
  • Work item types and workflows
  • Team structure and permissions
  • Reporting requirements
  • Integration needs (CI/CD, Slack, etc.)

Proceso (Protocol)

  1. Project structure — Design project hierarchy (project, board, backlog)
  2. Work item types — Define issue types (epic, feature, story, task, bug)
  3. Workflow design — Create status workflows per issue type
  4. Field configuration — Define custom fields per work item type
  5. Board setup — Configure board columns, swimlanes, and filters
  6. Automation rules — Design automation for transitions, notifications, SLA tracking
  7. Dashboard design — Create reporting dashboards with key metrics
  8. Permission scheme — Configure role-based access controls
  9. Integration setup — Plan integrations with other tools
  10. User guide — Create team guide for tool usage

Edge Cases

  1. Tool limitations prevent methodology implementation — Document limitation; design workaround configuration; if critical, recommend tool change via poc-lab evaluation.
  2. Multiple methodologies on same tool instance — Create separate project configurations per methodology; use shared fields for cross-methodology reporting.
  3. Team resistance to new tool configuration — Phase rollout; start with minimal changes; add features incrementally based on team feedback.
  4. Legacy data migration needed — Design migration mapping; validate field compatibility; plan data cleanup sprint before go-live.

Example: Good vs Bad

Good Tool Configuration:

AttributeValue
Workflow statesMatch methodology ceremonies exactly — no extra states [PLAN]
WIP limitsEnforced in board configuration, not just documented [METRIC]
Dashboards3 views: team daily, PM weekly, steering monthly [STAKEHOLDER]
AutomationSprint closure, SLA alerts, blocked item notifications [PLAN]
User guideRole-specific quick-start with screenshots [PLAN]

Bad Tool Configuration: Default Jira Scrum template with no customization. Workflows do not match team ceremonies, no WIP limits, no dashboards, no automation. Team uses tool as ticket dump rather than methodology engine.

Salida (Deliverables)

  • Tool configuration specification document
  • Workflow diagrams (Mermaid)
  • Field configuration matrix
  • Dashboard design mockups
  • Team user guide

Validation Gate

  • Workflows match designed methodology processes exactly — no orphan states
  • Every work item type has defined fields, workflow, and board representation
  • Board columns reflect actual workflow stages, not tool defaults
  • WIP limits configured and enforced where methodology requires them
  • Dashboards satisfy reporting requirements for all governance levels
  • Permission scheme implements role-based access without over-restricting
  • Automation rules tested and functional before team rollout
  • Configuration documented in specification — reproducible by admin
  • User guide covers daily team workflows with tool-specific instructions
  • Tool configuration supports, not constrains, the selected methodology

Escalation Triggers

  • Tool limitations preventing methodology implementation
  • License constraints limiting functionality
  • Integration failures with other tools
  • Team resistance to tool adoption

Additional Resources

ResourceWhen to readLocation
Body of KnowledgeBefore starting to understand standards and frameworksreferences/body-of-knowledge.md
State of the ArtWhen benchmarking against industry trendsreferences/state-of-the-art.md
Knowledge GraphTo understand skill dependencies and data flowreferences/knowledge-graph.mmd
Use Case PromptsFor specific scenarios and prompt templatesprompts/use-case-prompts.md
MetapromptsTo enhance output quality and reduce biasprompts/metaprompts.md
Sample OutputReference for deliverable format and structureexamples/sample-output.md

Output Configuration

  • Language: Spanish (Latin American, business register)
  • Evidence: [PLAN], [SCHEDULE], [METRIC], [INFERENCIA], [SUPUESTO], [STAKEHOLDER]
  • Branding: #2563EB royal blue, #F59E0B amber (NEVER green), #0F172A dark


Sub-Agents

Automation Rule Builder

Automation Rule Builder Agent

Core Responsibility

Builds automation rules for status updates and notifications. This agent operates autonomously, applying systematic analysis and producing structured outputs.

Process

  1. Gather Inputs. Collect all relevant data, documents, and stakeholder inputs needed for analysis.
  2. Analyze Context. Assess the project context, methodology, phase, and constraints.
  3. Apply Framework. Apply the appropriate analytical framework or model.
  4. Generate Findings. Produce detailed findings with evidence tags and quantified impacts.
  5. Validate Results. Cross-check findings against related artifacts for consistency.
  6. Formulate Recommendations. Transform findings into actionable recommendations with owners and timelines.
  7. Deliver Output. Produce the final structured output with executive summary, analysis, and action items.

Output Format

  • Analysis Report — Structured findings with evidence tags and severity ratings.
  • Recommendation Register — Actionable items with owners, deadlines, and success criteria.
  • Executive Summary — 3-5 bullet point summary for stakeholder communication.

Board Designer

Board Designer Agent

Core Responsibility

Designs Jira/Azure DevOps board layouts. This agent operates autonomously, applying systematic analysis and producing structured outputs.

Process

  1. Gather Inputs. Collect all relevant data, documents, and stakeholder inputs needed for analysis.
  2. Analyze Context. Assess the project context, methodology, phase, and constraints.
  3. Apply Framework. Apply the appropriate analytical framework or model.
  4. Generate Findings. Produce detailed findings with evidence tags and quantified impacts.
  5. Validate Results. Cross-check findings against related artifacts for consistency.
  6. Formulate Recommendations. Transform findings into actionable recommendations with owners and timelines.
  7. Deliver Output. Produce the final structured output with executive summary, analysis, and action items.

Output Format

  • Analysis Report — Structured findings with evidence tags and severity ratings.
  • Recommendation Register — Actionable items with owners, deadlines, and success criteria.
  • Executive Summary — 3-5 bullet point summary for stakeholder communication.

Reporting Dashboard Creator

Reporting Dashboard Creator Agent

Core Responsibility

Creates reporting dashboards with JQL/queries. This agent operates autonomously, applying systematic analysis and producing structured outputs.

Process

  1. Gather Inputs. Collect all relevant data, documents, and stakeholder inputs needed for analysis.
  2. Analyze Context. Assess the project context, methodology, phase, and constraints.
  3. Apply Framework. Apply the appropriate analytical framework or model.
  4. Generate Findings. Produce detailed findings with evidence tags and quantified impacts.
  5. Validate Results. Cross-check findings against related artifacts for consistency.
  6. Formulate Recommendations. Transform findings into actionable recommendations with owners and timelines.
  7. Deliver Output. Produce the final structured output with executive summary, analysis, and action items.

Output Format

  • Analysis Report — Structured findings with evidence tags and severity ratings.
  • Recommendation Register — Actionable items with owners, deadlines, and success criteria.
  • Executive Summary — 3-5 bullet point summary for stakeholder communication.

Workflow Configurer

Workflow Configurer Agent

Core Responsibility

Configures issue workflows with status transitions and rules. This agent operates autonomously, applying systematic analysis and producing structured outputs.

Process

  1. Gather Inputs. Collect all relevant data, documents, and stakeholder inputs needed for analysis.
  2. Analyze Context. Assess the project context, methodology, phase, and constraints.
  3. Apply Framework. Apply the appropriate analytical framework or model.
  4. Generate Findings. Produce detailed findings with evidence tags and quantified impacts.
  5. Validate Results. Cross-check findings against related artifacts for consistency.
  6. Formulate Recommendations. Transform findings into actionable recommendations with owners and timelines.
  7. Deliver Output. Produce the final structured output with executive summary, analysis, and action items.

Output Format

  • Analysis Report — Structured findings with evidence tags and severity ratings.
  • Recommendation Register — Actionable items with owners, deadlines, and success criteria.
  • Executive Summary — 3-5 bullet point summary for stakeholder communication.
Repository
JaviMontano/mao-pm-apex
Last updated
First committed

Canonical home

JaviMontano/mao-discovery-framework
In sync

since Aug 28, 2026

Is this your skill?

If you maintain this skill, you can claim it as your own. Once claimed, you can manage eval scenarios, bundle related skills, attach documentation or rules, and ensure cross-agent compatibility.