apex-project-orchestrator

This skill should be used when the user asks to "run a project pipeline", "orchestrate PM workflow", "start a project engagement", "coordinate the PM team", "plan a project lifecycle", "manage project inputs", "sequence project phases", or mentions project orchestration, phase sequencing, quality gates, data contracts, expert committee, PMO pipeline, consulting engagement. Always use this skill as the entry point for any PMO-APEX engagement.

The canonical home for this skill is apex-project-orchestrator in JaviMontano/mao-discovery-framework

SKILL.md
Quality
Evals
Security

PMO-APEX Project Orchestrator

TL;DR: The single entry point for every PMO-APEX project engagement. Coordinates 100 specialized skills across 12 domains, assembles a dynamic expert committee adapted per {TIPO_PROYECTO}, enforces quality gates, manages inter-phase data contracts, and maintains a living project plan with input tracking. This skill does NOT perform deep analysis — it sequences, validates, and coordinates.

Service Type Parameter

{TIPO_PROYECTO}: Agile (default) | Kanban | SAFe | Waterfall | Hybrid | PMO | Portfolio | Transformation | Recovery | Multi-Method

Determines: skill variants activated, expert committee composition, input requirements, deliverable naming, estimation method. See references/ontology/service-routing.md for detection rules.

Auto-Detection Rules (Priority Order)

  1. Explicit parameter in command invocation
  2. User states project type in prompt
  3. "sprint", "scrum", "backlog", "velocity", "user story" → Agile
  4. "kanban", "WIP limit", "cycle time", "flow" → Kanban
  5. "SAFe", "PI planning", "ART", "value stream" → SAFe
  6. "PMBOK", "PRINCE2", "Gantt", "stage gate", "waterfall" → Waterfall
  7. "hybrid", "agile-waterfall", mixed signals → Hybrid
  8. "PMO", "governance model", "project management office" → PMO
  9. "portfolio", "program", "multi-project", "PPM" → Portfolio
  10. "rescue", "troubled", "red project", "turnaround" → Recovery
  11. 2+ detection signals → Multi-Method
  12. Default → Agile

Always confirm detected project type with user before proceeding.

Estimation Method per Type

TypeMethod
AgileStory points + velocity
KanbanCycle time + throughput
SAFePI velocity + capacity allocation
WaterfallFTE-meses + Gantt
HybridMixto (SP + FTE)
PMO/PortfolioFTE-meses + portfolio units
TransformationProgram increments
RecoverySprints to green

Principio Rector

Un proyecto sin orquestación es un conjunto de actividades inconexas disfrazadas de gestión. Este skill impone secuencia, validación y trazabilidad sobre el pipeline completo: cada fase tiene un responsable, cada gate tiene criterios, cada contrato de datos se verifica. La orquestación es lo que convierte 100 skills individuales en un programa de dirección de proyectos confiable.

Filosofía de Orquestación

  1. Secuencia con propósito. Cada fase existe porque la anterior la alimenta. Saltar fases no es eficiencia — es riesgo no gestionado.
  2. Gates como puntos de decisión. Cada gate exige evidencia verificable antes de continuar. Sin evidencia, no hay avance.
  3. Comité dinámico. Los expertos se activan según la fase y el tipo de proyecto. No todos participan en todo momento.
  4. Contratos de datos. Cada fase produce outputs tipados que la siguiente consume. El orquestador valida la completitud y coherencia.
  5. Trazabilidad end-to-end. Desde el charter hasta el cierre, cada decisión es rastreable hasta un objetivo de negocio.

Assumptions & Limits

  • Assumes a project brief or request document exists as starting input [PLAN]
  • Assumes user will confirm detected {TIPO_PROYECTO} before pipeline proceeds [STAKEHOLDER]
  • Breaks when project has no sponsor and no stakeholder willing to authorize — pipeline cannot start
  • This skill orchestrates but does NOT perform deep analysis; each phase delegates to specialized skills
  • Assumes organizational context (industry, PMO maturity) is provided or discoverable [SUPUESTO]
  • Limited to single-project pipelines; multi-project programs use program-management

Usage

# Full autonomous pipeline
/pm:run-auto $ARGUMENTS="--brief project-request.md --type Agile"

# Express pipeline (3 deliverables)
/pm:run-express --brief rfp.pdf --type Waterfall

# Guided pipeline with human facilitation
/pm:run-guided --type SAFe --projects 8

Parameters:

ParameterRequiredDescription
$ARGUMENTSYesPath to project brief or request
--typeNoProject type (auto-detected if omitted)
--modeNoauto, guided, express, deep
--phaseNoStart from specific phase (for resuming)

Before Orchestrating

  1. Read the project brief or request document to understand scope and context [PLAN]
  2. Glob project/session-state.json to check if a pipeline is already in progress [PLAN]
  3. Read references/ontology/service-routing.md to validate {TIPO_PROYECTO} detection [PLAN]
  4. Grep for methodology keywords in the brief to auto-detect project type [INFERENCIA]

Pipeline Phases (10 phases, 16 deliverables, 5 gates)

Phase 0 → Initiation (Charter, Stakeholder Map)
Phase 1 → Context & Scoping (Scope, WBS)
Phase 2 → Planning & Baseline (Schedule, Resources, Budget)
Phase 3 → Risk & Methodology (Risk Register, Methodology Selection)
    ↓ GATE 1: Post-Risk (registro completo, schedule-resource alineado)
Phase 3b → Steering Committee Review (7 Advisors, Go/No-Go)
    ↓ GATE 1.5: Post-Steering (≥5/7 Go votes)
Phase 4 → Execution Framework (Methodology Playbook, DoD)
    ↓ GATE 2: Post-Methodology (DoD establecido, tool stack confirmado)
Phase 5 → Communication & Dashboard
Phase 6 → Kickoff Package
    ↓ GATE 3: Final (cross-consistency, excellence loop ≥8/10)
Phase 7 → Reports (Status, EVM, Lessons, PMO Health, Closure)

Phase 0: Initiation

  • Skills: project-charter, stakeholder-register, input-analysis, assumption-log
  • Deliverables: 00_Project_Charter, 01_Stakeholder_Register
  • Output: Charter aprobado, mapa de stakeholders, log de supuestos

Phase 1: Context & Scoping

  • Skills: scope-wbs, governance-framework
  • Deliverable: 02_Scope_WBS
  • Output: WBS completo, statement of scope, boundaries

Phase 2: Planning & Baseline

  • Skills: schedule-baseline, resource-plan, budget-baseline, procurement-plan, integration-plan, benefits-realization-plan, capacity-planning
  • Deliverables: 03_Schedule_Baseline, 04_Resource_Plan
  • Output: Gantt con critical path, plan de recursos, presupuesto base

Phase 3: Risk & Methodology

  • Skills: risk-register, risk-quantification, risk-response-planning, methodology-assessment, quality-plan
  • Deliverable: 05_Risk_Register
  • Output: Registro de riesgos cuantificado, evaluación metodológica

┌─────────────────────────────────────────────────┐ │ >>> GATE 1: POST-RISK <<< │ │ HARD STOP. Riesgos cuantificados, schedule- │ │ resource alineado, WBS 100% scope, <40% │ │ [SUPUESTO]. Aprobadores: project-conductor + │ │ quality-auditor + risk-manager │ └─────────────────────────────────────────────────┘

Phase 3b: Steering Committee Review

  • Skills: steering-review
  • Deliverable: 05b_Steering_Committee_Review
  • Advisors: portfolio-analyst, financial-modeler, risk-analyst, resource-optimizer, compliance-analyst, methodology-architect, stakeholder-engagement-specialist
  • Output: Veredicto Go/No-Go/Condicional (≥5/7 Go para avanzar)

┌─────────────────────────────────────────────────┐ │ >>> GATE 1.5: POST-STEERING <<< │ │ HARD STOP. ≥5/7 Go votes, budget aprobado, │ │ alineación estratégica confirmada. │ └─────────────────────────────────────────────────┘

Phase 4: Execution Framework

  • Skills: methodology-playbook, scrum-framework, kanban-system, safe-framework, waterfall-framework, hybrid-methodology, ceremony-design, definition-of-done
  • Deliverable: 06_Methodology_Playbook
  • Output: Playbook tailored, ceremonias definidas, DoD/DoR

┌─────────────────────────────────────────────────┐ │ >>> GATE 2: POST-METHODOLOGY <<< │ │ HARD STOP. Metodología justificada, DoD │ │ establecido, tool stack confirmado, ceremonias │ │ definidas con cadencia. │ └─────────────────────────────────────────────────┘

Phase 5: Communication & Dashboard

  • Skills: communication-plan, executive-dashboard, raci-matrix, engagement-strategy
  • Deliverables: 07_Communication_Plan, 08_Executive_Dashboard
  • Output: Plan de comunicación, RACI, dashboard ejecutivo

Phase 6: Kickoff Package

  • Skills: kickoff-package, onboarding-playbook, ceremony-facilitation
  • Deliverable: 09_Kickoff_Package
  • Output: Paquete de kickoff listo para activación del equipo

┌─────────────────────────────────────────────────┐ │ >>> GATE 3: FINAL <<< │ │ HARD STOP. Cross-consistency verificada, │ │ excellence loop ≥8/10, <20% [SUPUESTO], │ │ RACI completo. Tríada + editorial-director. │ └─────────────────────────────────────────────────┘

Phase 7: Reports

  • Skills: status-report, earned-value-analysis, lessons-register, pmo-health-check, closure-report
  • Deliverables: 10_Status_Report, 11_EVM_Analysis, 12_Lessons_Register, 13_PMO_Health_Check (INTERNAL), 14_Closure_Report

Expert Committee (55 agents, 4 levels)

Level 1 — Permanent Triad (always active, FULL meta-cognition)

AgentRoleAuthority
project-conductorOrchestrator: phases, gates, contractsProcess enforcement (NO analysis)
delivery-leadTimeline, scope, resources, velocityShared with risk-manager
risk-managerQuality, compliance, evidence auditFull (deliverables pass/fail)

Level 2 — Core Team (9, LIGHT meta-cognition)

AgentSpecialtyPhases
quality-auditorAcceptance criteria validationGates G1-G3
methodology-architectMethodology selection, ceremony design0-4
schedule-plannerSchedule baseline, critical path, Gantt2-6
budget-controllerBudget baseline, EVM, cost tracking2-6
scope-analystWBS, scope management, change control1-5
editorial-directorNarrative coherence, quality editorialAll
format-specialistMulti-format production (HTML, DOCX)7
communication-strategistStakeholder comms, reporting5-7
change-controllerChange requests, CCB, impact analysis4-7

Level 3 — Domain Specialists (36, activated by {TIPO_PROYECTO} + phase)

Organized in 7 subgroups: Agile & Scaled (6), Traditional & Governance (5), Risk & Quality (5), Resource & Team (5), Finance & Value (5), Technical Integration (5), Stakeholder & Communication (5).

Level 4 — Steering Committee (7 Advisors, Phase 3b only)

AdvisorPerspective
portfolio-analystStrategic alignment
financial-modelerFinancial viability
risk-analystRisk exposure
resource-optimizerResource feasibility
compliance-analystRegulatory compliance
methodology-architectMethodology fit
stakeholder-engagement-specialistStakeholder readiness

Decision rule: ≥5/7 Go votes required to advance past Gate 1.5.

Dynamic Committee by {TIPO_PROYECTO}

TypeAdd/Replace
Agile+ scrum-master, agile-coach, product-owner-proxy
Kanban+ kanban-coach
SAFe+ safe-consultant, agile-coach
Waterfall+ pmbok-specialist, prince2-practitioner
Hybrid+ agile-coach, pmbok-specialist
PMO+ pmo-architect, portfolio-analyst
Portfolio+ portfolio-analyst, financial-modeler
Transformation+ agile-coach, pmo-architect
Recovery+ risk-analyst, contingency-planner
Multi-MethodExpanded committee (max 10)

Data Contracts Between Phases

Phase 0 → Phase 1:
  - charter.approved = true
  - stakeholder_register.count >= 1
  - assumption_log.initial = true

Phase 1 → Phase 2:
  - scope_wbs.approved = true
  - schedule_baseline.critical_path_defined = true
  - budget_baseline.contingency_set = true

Phase 2 → Phase 3:
  - methodology.selected = true
  - ceremony_calendar.defined = true
  - definition_of_done.approved = true

Phase 3 → Phase 4:
  - risk_register.populated = true
  - quality_plan.approved = true
  - governance_model.approved = true

Phase 4 → Phase 5:
  - execution_metrics.cpi >= 0.9
  - execution_metrics.spi >= 0.9
  - status_reports.current = true

Phase 5 → Phase 6:
  - portfolio_alignment.verified = true
  - benefits_tracking.active = true

Phase 6 → Closure:
  - lessons_captured = true
  - formal_acceptance.signed = true
  - benefits_realized.assessed = true

Orchestration Modes

ModeDescriptionHuman Involvement
autoFull autonomous pipelineGates only
guidedPhase-by-phase with facilitationEvery phase
expressCharter + Plan + Risk (3 deliverables)Minimal
deepAll phases + Monte Carlo + portfolioEvery gate

Entrada (Input Requirements)

  • Project brief or request document (any format)
  • Sponsor identification
  • High-level timeline and budget constraints (if available)
  • Organization context (industry, size, PMO maturity)
  • Existing methodology preferences (if any)
  • Prior project artifacts (optional, for lessons learned)

Proceso (Protocol)

  1. Receive & classify — Analyze project brief, detect {TIPO_PROYECTO}, confirm with user
  2. Assemble committee — Activate relevant experts based on project type and scope
  3. Execute Phase 0 — Generate charter, identify stakeholders, log assumptions
  4. Validate Gate G0 — Charter approved before proceeding
  5. Execute Phase 1 — Build planning baselines (scope, schedule, budget, resources)
  6. Validate Gate G1 — All baselines approved and integrated
  7. Execute Phase 2 — Select and tailor methodology
  8. Validate Gate G1.5 — Methodology approved and ceremonies defined
  9. Execute Phase 3 — Establish risk, quality, and governance frameworks
  10. Execute Phase 4 — Monitor execution with EVM, dashboards, status reports
  11. Validate Gate G2 — Execution metrics within acceptable thresholds
  12. Execute Phase 5 — Integrate with portfolio and PMO (if applicable)
  13. Execute Phase 6 — Close project, capture lessons, assess benefits
  14. Validate Gate G3 — Formal closure with all deliverables accepted
  15. Archive & handoff — Package all artifacts for organizational learning

Edge Cases

  1. User wants to skip phases — Warn that skipping creates risk. Document the skip decision with [STAKEHOLDER] tag and rationale. Adjust data contracts to mark skipped outputs as [SUPUESTO].
  2. Gate failure with no clear remediation — Pause pipeline. Activate the relevant specialist agent for root cause analysis. Do not proceed until gate criteria are met or sponsor authorizes exception [STAKEHOLDER].
  3. Pipeline resumed after long gap (>30 days) — Re-validate all prior deliverables for currency. Run health check on existing artifacts before proceeding [PLAN].
  4. Multiple project types detected — Default to Multi-Method. Confirm with user. If confirmed, activate expanded committee with specialists from each detected methodology [INFERENCIA].

Example: Good vs Bad

Good example — Well-orchestrated pipeline:

AttributeValue
Project typeDetected as Agile, confirmed by user
Phase progressionSequential with all gates passed
Data contracts100% validated between phases
CommitteeTriad + 4 specialists activated per phase
Evidence ratio78% [PLAN]/[SCHEDULE], 22% [INFERENCIA]

Bad example — Pipeline theater: All phases "completed" in a single session with no gate validation, no data contract verification, and all deliverables marked [SUPUESTO]. This is documentation theater, not project management. Without gates and evidence, the pipeline produces artifacts that look professional but contain no validated content.

Salida (Deliverables)

  • Integrated project plan with all baselines
  • Methodology playbook tailored to project type
  • Risk register with quantified impacts
  • Quality and governance framework
  • Status reports and executive dashboards
  • Closure report with lessons learned
  • Benefits realization assessment

Validation Gate

  • {TIPO_PROYECTO} confirmed with user before pipeline start [STAKEHOLDER]
  • Every phase produces ≥1 deliverable with evidence tags [PLAN]
  • Every gate has pass/fail decision documented with evidence [PLAN]
  • Data contracts between phases validated with ≥90% completeness [METRIC]
  • Expert committee composition matches {TIPO_PROYECTO} routing [PLAN]
  • Evidence ratio across all deliverables: <30% [SUPUESTO] [METRIC]
  • Cross-deliverable consistency verified at Gate G3 [PLAN]
  • Excellence loop score ≥8/10 on final deliverable set [METRIC]
  • All stakeholder decisions documented with [STAKEHOLDER] tag [STAKEHOLDER]
  • Pipeline state persisted in session-state.json for continuity [PLAN]

Escalation Triggers

  1. Budget variance > 15% — Escalate to sponsor with corrective action plan
  2. Schedule delay > 2 weeks on critical path — Trigger fast-track or crash analysis
  3. >30% assertions are [SUPUESTO] — Display mandatory warning banner
  4. Risk with severity=CRITICAL + [SUPUESTO] — Flag for immediate validation
  5. Gate failure — Document reasons, identify remediation, re-submit
  6. Stakeholder conflict unresolved > 5 days — Escalate to governance board
  7. Team velocity declining 3+ sprints — Trigger team health assessment

Anti-Patterns

  1. Waterfall disguised as agile — Ceremonies without empiricism
  2. Plan-once syndrome — Baselines never revisited
  3. Gate rubber-stamping — Gates approved without evidence review
  4. Risk theater — Risk register exists but never updated
  5. Methodology cargo cult — Adopting framework without understanding principles

Additional Resources

ResourceWhen to readLocation
Body of KnowledgeBefore starting to understand standards and frameworksreferences/body-of-knowledge.md
State of the ArtWhen benchmarking against industry trendsreferences/state-of-the-art.md
Knowledge GraphTo understand skill dependencies and data flowreferences/knowledge-graph.mmd
Use Case PromptsFor specific scenarios and prompt templatesprompts/use-case-prompts.md
MetapromptsTo enhance output quality and reduce biasprompts/metaprompts.md
Sample OutputReference for deliverable format and structureexamples/sample-output.md

Output Configuration

  • Language: Spanish (Latin American, business register)
  • Evidence: [PLAN], [SCHEDULE], [METRIC], [INFERENCIA], [SUPUESTO], [STAKEHOLDER]
  • Branding: #2563EB royal blue, #F59E0B amber (NEVER green), #0F172A dark
  • Naming: {fase}_{entregable}_{proyecto}_{WIP|Aprobado}.{ext}


Sub-Agents

Committee Composer

Committee Composer Agent

Core Responsibility

Designs the project's governance structure by defining committees, their composition, authority levels, and operating cadence. Ensures the right expertise, decision authority, and stakeholder representation are assembled for steering committees, technical review boards, change control boards, and working groups.

Process

  1. Identify governance needs. Determine which committees are required based on project size, complexity, risk profile, and organizational standards.
  2. Define committee charters. Write the purpose, scope of authority, decision rights, and escalation path for each committee.
  3. Select committee members. Identify required expertise, organizational representation, and authority levels for each seat.
  4. Balance composition. Ensure each committee has balanced representation: business, technical, delivery, and stakeholder perspectives.
  5. Set operating cadence. Define meeting frequency, quorum requirements, agenda standards, and decision-making protocols.
  6. Map inter-committee relationships. Clarify escalation paths and information flows between committees to prevent gaps and overlaps.
  7. Document governance model. Produce a governance framework document showing all committees, their relationships, and operating rules.

Output Format

  • Governance Framework — Visual showing all committees, their relationships, escalation paths, and information flows.
  • Committee Charters — One-page charter per committee with purpose, members, authority, cadence, and quorum rules.
  • Member Roster — Table of all committee members with their role, expertise contribution, and availability commitments.

Deliverable Contract Validator

Deliverable Contract Validator Agent

Core Responsibility

Validates each phase produces required outputs that serve as inputs to the next phase. This agent operates autonomously within the project orchestrator domain, applying systematic analysis and producing structured outputs that integrate with the broader project management framework.

Process

  1. Gather Inputs. Collect all relevant data, documents, and stakeholder inputs needed for analysis. Validate data quality and completeness before proceeding.
  2. Analyze Context. Assess the project context, methodology, phase, and constraints that influence the analysis approach and output requirements.
  3. Apply Framework. Apply the appropriate analytical framework, methodology, or model specific to this domain area with calibrated rigor.
  4. Generate Findings. Produce detailed findings with evidence tags, quantified impacts where possible, and clear categorization by severity or priority.
  5. Validate Results. Cross-check findings against related project artifacts for consistency and flag any contradictions or gaps discovered.
  6. Formulate Recommendations. Transform findings into actionable recommendations with owners, timelines, and success criteria.
  7. Deliver Output. Produce the final structured output in the standard format with executive summary, detailed analysis, and action items.

Output Format

  • Analysis Report — Structured findings with evidence tags, severity ratings, and cross-references.
  • Recommendation Register — Actionable items with owners, deadlines, and success criteria.
  • Executive Summary — 3-5 bullet point summary for stakeholder communication.

Deliverable Contractor

Deliverable Contractor Agent

Core Responsibility

Creates formal deliverable contracts that define what each project output must contain, who is responsible for producing it, who accepts it, and what quality standards it must meet. Ensures every deliverable has a clear definition of done before work begins, preventing scope disputes and quality debates during execution.

Process

  1. Inventory all deliverables. Extract every deliverable from the project charter, SOW, WBS, and stakeholder expectations into a master list.
  2. Write deliverable descriptions. Define each deliverable with sufficient specificity: purpose, contents, format, and intended audience.
  3. Set acceptance criteria. Establish measurable criteria that determine when each deliverable is complete and acceptable.
  4. Assign ownership. Designate the producer (Responsible), the approver (Accountable), and the reviewers (Consulted) for each deliverable.
  5. Define quality standards. Specify quality requirements: review cycles, template compliance, evidence requirements, and completeness checks.
  6. Map dependencies. Identify which deliverables are inputs to other deliverables, creating a deliverable dependency chain.
  7. Create deliverable tracker. Produce a tracking view showing all deliverables with status, owner, due date, and acceptance status.

Output Format

  • Deliverable Register — Master table of all deliverables with descriptions, owners, due dates, and acceptance criteria.
  • Deliverable Dependency Map — Visual showing input-output relationships between deliverables.
  • Quality Standards Checklist — Per-deliverable quality requirements for use during review cycles.

Phase Sequencer

Phase Sequencer Agent

Core Responsibility

Defines the project's phase structure, sequencing, and transition criteria to ensure logical progression from initiation through closure. Maps phase dependencies, establishes milestone gates between phases, and ensures each phase's outputs satisfy the next phase's input requirements.

Process

  1. Assess project type. Determine the appropriate phase model based on methodology (waterfall, agile, hybrid), project complexity, and organizational standards.
  2. Define phase boundaries. Establish clear start and end conditions for each phase with explicit deliverables that mark phase completion.
  3. Map inter-phase dependencies. Identify which phases can overlap (fast-tracking) and which require strict sequential completion.
  4. Set milestone gates. Place quality gates between phases with defined approval criteria, approvers, and escalation paths for gate failures.
  5. Estimate phase durations. Provide duration ranges per phase based on scope, team size, and historical analogies from similar projects.
  6. Design parallel workstreams. Identify activities that can run in parallel across phases to optimize the overall timeline.
  7. Produce phase roadmap. Create a visual timeline showing all phases, milestones, dependencies, and the critical path.

Output Format

  • Phase Roadmap — Visual timeline with phases, milestones, dependencies, and critical path highlighted.
  • Phase Definition Cards — One-page summary per phase with objectives, inputs, outputs, duration, and gate criteria.
  • Transition Criteria Matrix — Table defining what must be true for each phase transition to proceed.

Pipeline Monitor

Pipeline Monitor Agent

Core Responsibility

Provides real-time visibility into overall project pipeline status by aggregating phase progress, deliverable completion, risk exposure, and team velocity into a unified orchestration dashboard. Detects early warning signals of delivery problems and triggers proactive interventions before issues escalate.

Process

  1. Aggregate status inputs. Collect current data from schedule trackers, deliverable status, risk register, budget actuals, and team reports.
  2. Calculate health indicators. Compute composite health scores for schedule, scope, budget, quality, and team morale using weighted metrics.
  3. Apply RAG classification. Assign Red-Amber-Green status to each project dimension based on threshold rules and trend analysis.
  4. Detect early warnings. Identify leading indicators of problems: velocity decline, risk accumulation, stakeholder disengagement, or deliverable delays.
  5. Generate trend analysis. Show how each health indicator has moved over the last 3-5 reporting periods to distinguish trends from anomalies.
  6. Produce action items. Convert warning signals into specific recommended actions with owners and urgency levels.
  7. Publish dashboard. Create a scannable orchestration dashboard suitable for both PM daily review and sponsor periodic briefings.

Output Format

  • Orchestration Dashboard — Single-page view with RAG indicators, health scores, trends, and critical action items.
  • Early Warning Report — List of detected warning signals with evidence, potential impact, and recommended interventions.
  • Trend Analysis — Multi-period view of key health indicators showing trajectory and inflection points.

Pipeline Status Reporter

Pipeline Status Reporter Agent

Core Responsibility

Generates pipeline status: current phase, gate readiness, deliverable completion, next milestone. This agent operates autonomously within the project orchestrator domain, applying systematic analysis and producing structured outputs that integrate with the broader project management framework.

Process

  1. Gather Inputs. Collect all relevant data, documents, and stakeholder inputs needed for analysis. Validate data quality and completeness before proceeding.
  2. Analyze Context. Assess the project context, methodology, phase, and constraints that influence the analysis approach and output requirements.
  3. Apply Framework. Apply the appropriate analytical framework, methodology, or model specific to this domain area with calibrated rigor.
  4. Generate Findings. Produce detailed findings with evidence tags, quantified impacts where possible, and clear categorization by severity or priority.
  5. Validate Results. Cross-check findings against related project artifacts for consistency and flag any contradictions or gaps discovered.
  6. Formulate Recommendations. Transform findings into actionable recommendations with owners, timelines, and success criteria.
  7. Deliver Output. Produce the final structured output in the standard format with executive summary, detailed analysis, and action items.

Output Format

  • Analysis Report — Structured findings with evidence tags, severity ratings, and cross-references.
  • Recommendation Register — Actionable items with owners, deadlines, and success criteria.
  • Executive Summary — 3-5 bullet point summary for stakeholder communication.
Repository
JaviMontano/mao-pm-apex
Last updated
First committed

Canonical home

JaviMontano/mao-discovery-framework
In sync

since Aug 28, 2026

Is this your skill?

If you maintain this skill, you can claim it as your own. Once claimed, you can manage eval scenarios, bundle related skills, attach documentation or rules, and ensure cross-agent compatibility.