Assess workloads using the 7R framework, classify migration strategies, plan migration waves, and design cutover procedures for moving systems to cloud infrastructure.

Guiding Principle

"Migration is not a destination — it is a transformation. Every workload moved is an opportunity to improve, not just relocate."

Procedure

Step 1 — Portfolio Discovery & 7R Assessment

  1. Inventory all applications, databases, and infrastructure components
  2. Collect metadata: technology stack, dependencies, data volumes, SLAs
  3. Classify each workload using the 7R framework: Rehost, Replatform, Refactor, Repurchase, Retire, Retain, Relocate
  4. Score migration complexity per workload: low/medium/high/very-high
  5. Produce a migration disposition matrix with rationale per classification

Step 2 — Dependency Mapping & Risk Analysis

  1. Map application-to-application dependencies (network, data, API)
  2. Identify shared services and databases that create migration coupling
  3. Classify risks per workload: data loss, downtime, performance, compliance
  4. Identify migration blockers: licensing, hardware dependencies, security constraints
  5. Produce a dependency graph with migration-critical paths highlighted

Step 3 — Wave Planning

  1. Group workloads into migration waves based on dependencies and risk
  2. Sequence waves from low-risk/low-dependency to high-complexity
  3. Define success criteria and rollback triggers per wave
  4. Estimate duration and team resources per wave
  5. Build a migration timeline with parallel and sequential workstreams

Step 4 — Cutover Design

  1. Design cutover procedure for each migration pattern (rehost, replatform, refactor)
  2. Define data synchronization strategy: one-time vs. continuous replication
  3. Plan DNS/traffic switchover approach: blue-green, canary, weighted routing
  4. Design rollback procedure with maximum acceptable rollback window
  5. Create a cutover runbook with step-by-step instructions and decision points

Quality Criteria

  • Every workload has a 7R classification with documented rationale
  • Dependency map validated against actual network traffic data
  • Wave plan respects dependency ordering with no orphaned workloads
  • Cutover runbook tested in dry-run with documented results

Anti-Patterns

  • Migrating everything as rehost without evaluating modernization opportunities
  • Ignoring database dependencies when planning migration waves
  • No rollback plan or untested rollback procedures
  • Wave planning based on org chart rather than technical dependencies
Repository
JaviMontano/mao-sovereign-architect
Last updated
First committed

Also appears in

JaviMontano/jm-adk
In sync

since Aug 28, 2026

Is this your skill?

If you maintain this skill, you can claim it as your own. Once claimed, you can manage eval scenarios, bundle related skills, attach documentation or rules, and ensure cross-agent compatibility.