Migration Planner

Produces detailed migration plans for legacy modernization, platform changes, and data migrations, using proven patterns like Strangler Fig, Blue-Green, and incremental parallel-run strategies.

Guiding Principle

"The safest migration is the one where you can turn back at every step."

Procedure

Step 1 — Assess Current State

  1. Inventory the current system: components, integrations, data stores, and external dependencies.
  2. Map traffic patterns and peak usage windows.
  3. Identify the migration drivers: end-of-life, cost, performance, compliance, or feature velocity.
  4. Classify risk per component: data loss risk, downtime sensitivity, regulatory constraints.
  5. Document the "do nothing" cost as a baseline.

Step 2 — Select Migration Strategy

  1. Evaluate migration patterns against the current state:
    • Strangler Fig: Incrementally replace components behind a routing facade.
    • Blue-Green: Run old and new systems in parallel, switch traffic atomically.
    • Lift and Shift: Move as-is to new infrastructure (lowest risk, lowest benefit).
    • Re-platform: Adapt to new runtime without rewriting (e.g., containerize).
    • Re-architect: Redesign and rebuild from scratch (highest risk, highest benefit).
  2. Document the chosen strategy with justification against the risk profile.
  3. Define the rollback mechanism for each phase.

Step 3 — Data Migration Plan

  1. Profile source data: volume, schema, quality issues, referential integrity.
  2. Design the ETL/ELT pipeline with transformation rules.
  3. Plan for dual-write or change-data-capture (CDC) during the transition period.
  4. Define data validation criteria: row counts, checksums, business rule assertions.
  5. Schedule migration rehearsals on production-like data.

Step 4 — Execution Roadmap

  1. Break the migration into phases with clear milestones and go/no-go gates.
  2. Define success criteria for each phase (latency, error rate, data consistency).
  3. Assign ownership per phase and establish a war-room cadence.
  4. Document the communication plan for stakeholders and end users.
  5. Produce a rollback runbook for each phase.

Quality Criteria

  • Every phase has an explicit rollback procedure tested in a rehearsal environment.
  • Data validation includes both automated checks and manual spot-checks.
  • Migration plan accounts for peak traffic windows and avoids them for cutover.
  • Total acceptable downtime is defined and each phase's contribution is budgeted.

Anti-Patterns

  • "Big bang" migration with no rollback path ("hope-driven migration").
  • Migrating data without profiling quality, then discovering corruption post-cutover.
  • Running dual systems indefinitely without a decommission deadline ("zombie legacy").
  • Skipping migration rehearsals because "it worked in staging."
Repository
JaviMontano/mao-sovereign-architect
Last updated
First committed

Also appears in

JaviMontano/jm-adk
In sync

since Aug 28, 2026

Is this your skill?

If you maintain this skill, you can claim it as your own. Once claimed, you can manage eval scenarios, bundle related skills, attach documentation or rules, and ensure cross-agent compatibility.