Content
90%Weight 40%Scale 1-5Reviews the quality of instructions and guidance provided to agents. Good implementation is clear, handles edge cases, and produces reliable results.
The body is a lean, fully actionable instruction set: concrete spec-discovery patterns, a discrepancy report template with file:line citations, explicit user decision gates, and post-change validation. The only gaps are a missing explicit fix-and-retry loop after lint/typecheck failure and a single-file structure that, while well-organized, is slightly above the lean-overview ideal.
| Dimension | Reasoning | Score |
|---|---|---|
Conciseness | Six one-line drift categories, a four-bullet mutation policy, and template-driven workflow steps — every line is directive, and nothing explains concepts Claude already knows. The two-sentence principle framing ("A spec describes intended behavior; code implements it") earns its place by establishing the skill's stance. Matches anchor 5's lean, competence-assuming standard. | 5 / 5 |
Actionability | Concrete search globs ("*.spec.md", "spec/*.md"), a mapping table format, a copy-paste discrepancy report template with file:line citations, stable DRIFT-NN IDs, explicit three-option decisions, and post-change verification (lint/typecheck, unit tests). Per the rubric's instruction-skill note, the absence of code is not penalized when guidance is this executable — matches anchor 5. | 5 / 5 |
Workflow Clarity | Six clearly sequenced steps with a decision gate (Step 4) and validation steps ("run lint/typecheck after changes", "If unit tests exist for the affected code, run them"), plus edge handling for missing/multiple specs. Falls short of anchor 5 only because there is no explicit fix-and-retry feedback loop after validation failure. | 4 / 5 |
Progressive Disclosure | No bundle files exist and the skill is a single well-organized file (Principles / Workflow sections); all content is operational and appropriately inline. It sits at anchor 4 rather than 5 because at ~107 lines it exceeds the lean single-file ideal, and the report templates could eventually live in a reference file. | 4 / 5 |
Total | 18 / 20 Passed |