CtrlK
BlogDocsLog inGet started
Tessl Logo
SkillPublic

nex-manufacturing-handoff-pack

Turns a design package into a manufacturing handoff: BOM, drawing checklist, tolerance notes, supplier RFQ and first-article inspection plan. Use when: Standardize BOMs for supplier-ready RFQ packages; Generate PCB fabrication and assembly instruction templates; Create first-article inspection plans for quality control.

Quality

63%

Does it follow best practices?

Run evals on this skill

Adds up to 20 points to the overall score

View guide
SecuritybySnyk

Passed

No findings from the security scan

Fix and improve this skill with Tessl

tessl review fix ./skills/nex-manufacturing-handoff-pack/SKILL.md
SKILL.md
Quality
Evals
Security

Nex Manufacturing Handoff Pack

Free skill by Nex AI. This file is the public guide from Agensi. Scripts, extension source, and templates from the original package are not in this folder.

What it does

  • Normalises the bill of materials into a supplier-ready format with part numbers, quantities, materials and finishes.
  • Runs a drawing package checklist so nothing ships without tolerances, datums, surface finish and revision control.
  • Generates the RFQ pack per supplier with quantities, lead time questions and quality requirements.
  • Builds the first-article inspection plan mapping every critical dimension to a measurement method.

Use cases

  • A hardware team handing a design to a contract manufacturer for the first time
  • Requesting quotes from several suppliers on the same basis
  • Preparing a first-article inspection before a production run
  • Cleaning up a messy BOM inherited from CAD export

Known limitations

Generic mechanical manufacturing, not PCB assembly or regulated medical device production. Output is a working document that your engineer reviews, and it does not replace a quality management system.

Example

Request

I need to prepare a manufacturing handoff for my Project X PCB. It is a 4-layer board, ENIG finish, IPC Class 2. Help me generate the documentation pack.

Result

Generated the following templates:

  • fabrication-notes.md: 4-layer, ENIG, IPC Class 2 specs.
  • assembly-notes.md: SMT instructions.
  • bom-cover-sheet.md: Ready for part data.
  • revision-history.md: Initial release. Next: Let's review the handoff-checklist.md together.

Questions

Does this skill generate Gerber or CAD files?

No. It provides Markdown templates for fabrication and assembly notes that you must include alongside your exported design files.

What documents are included in the pack?

The skill covers standard mechanical and PCB handoffs, including BOM normalization, inspection plans, and fabrication notes.

Can it help with quality control planning?

Yes. It generates a first-article inspection (FAI) plan that maps critical dimensions to specific measurement methods.

Is this suitable for medical device manufacturing?

It is optimized for generic mechanical and electronics manufacturing, not for highly regulated medical or aerospace-grade certifications.


Built by Nex AI. More skills, including the paid catalog: https://www.agensi.io/creators/ch1n4-g3nd4x

Repository

NexaiGuy/nex-ai-skills

Path

skills/nex-manufacturing-handoff-pack/SKILL.md

Last updated
First committed

Also appears in

NexaiGuy/nex-ai-skills
In sync

since Nov 6, 2026

Is this your skill?

If you maintain this skill, you can claim it as your own. Once claimed, you can manage eval scenarios, bundle related skills, attach documentation or rules, and ensure cross-agent compatibility.