Content
86%Weight 40%Scale 1-5Reviews the quality of instructions and guidance provided to agents. Good implementation is clear, handles edge cases, and produces reliable results.
A well-structured skill body: lean, domain-specific, with a real executable tool, an explicit validation gate on the launch date, and a clean one-level-deep reference split. The one verified defect is an accuracy mismatch between the gating rule's category names ('owned channels ready,' 'assets ready') and the scorer's actual default categories (product/marketing/technical), which slightly weakens both actionability and the validation checkpoint.
Suggestions
Align the gating rule's category names ('owned channels ready,' 'assets ready') with the scorer's actual default categories (product, marketing, technical), or explicitly state that checklist categories are user-defined and the template from --export-template defines the ones to gate on.
Add a minimal checklist.json example (or a pointer to the --export-template output format) so the readiness gate is directly executable without opening the script.
State Claude's own planning procedure as an ordered sequence (read marketing-context → ask task-specific questions → build ORB channel map and phased plan → score readiness → gate the date) instead of leaving it implied by section order.
| Dimension | Reasoning | Score |
|---|---|---|
Conciseness | The body is lean throughout — the ORB model gets one line per channel, the phase model one line per phase, tools and artifacts are compressed into tables, and related skills use terse USE/NOT-FOR boundaries. It adds only domain judgment Claude lacks ('A launch is a momentum system, not a day'; borrowed channels 'require relationship work weeks before launch day') and never explains concepts Claude already knows. The only near-redundancy — the all-three-channels quality bar stated in both Core Philosophy and Communication — is deliberate point-of-use emphasis, not padding. | 5 / 5 |
Actionability | Mostly executable: the Tools table gives an exact verified command ('python3 scripts/launch_readiness_scorer.py --checklist launch.json') whose flags match the script's actual argparse, and guidance is time-boxed ('2-6 weeks out,' 'again one week out'). It is not score 5 because the gating rule references scorer categories 'owned channels ready' and 'assets ready' that the script's default template does not emit (its categories are product/marketing/technical), so an agent following the gate literally would look for categories that do not exist. | 4 / 5 |
Workflow Clarity | The phase model sequences the launch (pre-launch → launch day → 30-day post-launch) and the readiness scorer provides an explicit validation checkpoint with a recovery rule ('score the checklist when planning starts and again one week out — launching below a passing score... means slipping the date, not hoping'). It is not score 5 because the validation checkpoint inherits the category-name mismatch, and Claude's own planning procedure (context → questions → ORB map → score → gate) is implied by section order rather than stated as a sequence. | 4 / 5 |
Progressive Disclosure | Verified against the actual bundle: SKILL.md is a lean overview, the deep material (full ORB treatment, five-phase approach, Product Hunt strategy, post-launch actions) lives in the real one-level-deep references/launch-frameworks-and-checklists.md, and the executable tool lives in scripts/ with correctly documented flags. The reference is clearly signaled inline ('full treatment in references/launch-frameworks-and-checklists.md'), contains no nested references, and nothing that belongs in a separate file is inlined. | 5 / 5 |
Total | 18 / 20 Passed |