CtrlK
BlogDocsLog inGet started
Tessl Logo

ship

Land completed Fallow work after review, run pre-push parity, monitor merged-commit CI, and leave repositories clean. Use when asked to ship, merge, or move approved work to main.

72

Quality

88%

Does it follow best practices?

Run evals on this skill

Adds up to 20 points to the overall score

View guide

SecuritybySnyk

Passed

No findings from the security scan

SKILL.md
Quality
Evals
Security

Ship

  1. Confirm the branch and diff exactly match the reviewed scope.
  2. Re-run the required checks from docs/development/quality-gates.md.
  3. Verify that public contracts and generated files are pushed. Merge each companion change into the default branch of its repository (for example fallow-docs main). A pushed feature branch is not enough: the release then must merge it.
  4. Create signed conventional commits only.
  5. Merge through the repository's current protected-main workflow.
  6. Monitor the merged commit until required CI completes. Before you retry a failed job, confirm that the branch contains the current base (git merge-base --is-ancestor origin/main HEAD). A second identical failure is a defect, not a flake: diagnose it instead of a third retry.
  7. Inspect the merged tree for conflict markers and generated drift.
  8. Return every touched checkout to a clean, synchronized state.

Do not call work complete while required merged-commit workflows are still running.

Repository
fallow-rs/fallow
Last updated
First committed

Is this your skill?

If you maintain this skill, you can claim it as your own. Once claimed, you can manage eval scenarios, bundle related skills, attach documentation or rules, and ensure cross-agent compatibility.