Manages the handoffs/ directory — a chronological log of session-ending state snapshots. Write a handoff when finishing a session or completing a unit of work. Read the latest handoff when resuming a project. The next agent reads ONLY the most recent handoff file; older files are the user's version history and must not be read by the agent. Load this skill when asked to hand off, wrap up, or when resuming a project that has a handoffs/ directory.
88%
Does it follow best practices?
Run evals on this skill
Adds up to 20 points to the overall score
Passed
No findings from the security scan
handoffs/ is a chronological log of project state. Each file is a complete,
self-contained snapshot of where the project stands. The latest file is the
only file the next agent reads. Older files are version history for the
human — the agent must not read them.
handoffs/YYYY-MM-DDTHHMM.mdExamples:
handoffs/2026-05-13T1430.md
handoffs/2026-05-13T1645.md ← supersedes the one above
handoffs/2026-05-14T0900.md ← this becomes the new latestUse the current UTC time when writing. The lexicographic sort order of the filenames is their chronological order — the last file alphabetically is always the latest.
Make sure
handoffs/is gitignored, or commit it as part of the human-readable project log — whichever your team prefers. This skill takes no position on that.
Write a new handoff file whenever:
/handoff).Every handoff must be fully self-contained. Do not reference or say "see previous handoff". The agent reading it will not look at any other file unless the handoff explicitly tells it to.
Use this template. Where the template links to per-task artifacts (plans, PRs, issue trackers, per-feature directories), use whatever convention this project follows. If the project has none, just describe the work inline.
# Handoff — YYYY-MM-DD HH:MM UTC
## Project state
<One paragraph. What is this project, what is its current overall status, and
what is the highest-priority thing the next session should focus on?>
## Completed this session
<What was finished. Link to a plan file, PR, issue, or per-task directory if
this project uses one. Otherwise just describe inline.
If nothing was completed, write "Nothing completed this session.">
- <task or feature name> — <one-line summary of what was done>
## In progress
<Work that was started but not finished. Be specific about exactly how far
along each one is and what remains.>
- <task or feature name> — <current state, what's done, what's next>
If none: "Nothing in progress."
## Next steps
Ordered list of what the next agent or developer should do first:
1. <Most important next action — be specific enough that someone can act on it immediately>
2. <Second action>
3. ...
## Context and gotchas
Things the next agent needs to know that are not obvious from the code:
- <gotcha / environment note / known issue / external dependency status>
- ...
If none: "No special context."
## Reading list
Files the next agent should read (beyond this handoff and UML.md):
- `<path>` — <why it's relevant>
- ...
If none: "No additional files needed."When resuming a project that has a handoffs/ directory:
handoffs/.handoffs/.UML.md (if present) is the architectural reference; the handoff is the
operational state.| File | Role |
|---|---|
handoffs/<latest>.md | Operational state — what's happening right now, what to do next |
UML.md | Architectural reference — module map, diagrams, long-term structure |
The handoff describes operational state; UML.md describes architectural
structure. Together they let the next session get oriented without reading
every source file. If your project keeps per-task artifacts (plans, PRs,
feature directories, issues), link to them from the handoff so the next agent
can drill down.