Content
88%Weight 40%Scale 1-5Reviews the quality of instructions and guidance provided to agents. Good implementation is clear, handles edge cases, and produces reliable results.
An exemplary operational skill body: every step is executable, validated, and gated, with genuinely non-obvious project knowledge (the first-deploy two-cycle requirement, the export hang workaround) that earns its tokens. The only structural improvement is pushing more of the Step 2.5 reconciliation handoff detail and known-issue exposition into the referenced files to slim the main body.
| Dimension | Reasoning | Score |
|---|---|---|
Conciseness | Efficient, operationally dense content with almost no general-knowledge padding — the long explanations (export hang, two-cycle first deploy) are non-obvious project-specific gotchas, not things Claude already knows. Minor trimming possible: the two-cycle rationale is explained in Step 1.5 (including the user-facing quote) and repeated in Step 3's "First-deploy loop-back". | 4 / 5 |
Actionability | Fully executable throughout: copy-paste bash blocks (schema regeneration, Node version gate, Hermes c61fbc03 magic-byte verification, detached export with log polling), exact confirmation phrases ("yes deploy to <env-name>", "deploy without offline"), and an error-to-fix table. All common cases are covered. | 5 / 5 |
Workflow Clarity | Explicit numbered sequence (1 → 1.5 → 2 → 2.4 → 2.5 → 3 → 4) with validation checkpoints at every risky step (dist verification, Node gate, bundle/manifest checks, offline delta gate, environment mismatch gate), feedback loops for error recovery (fix-and-retry, re-run delta check after reconciliation), explicit STOP conditions, and hard confirmation gates before the live push. | 5 / 5 |
Progressive Disclosure | References to shared/plugin files are clearly signaled, one level deep, and each states its purpose (cli-binary.md, offline-profile-reconciliation.md, app-working-directory.md, version-check.md, memory-bank.md), with a bottom Reference section. However, ~150 lines of gate and reconciliation detail (Step 2.5's scoped-helper handoffs, the export-hang known issue) are inlined in the body and could partly live in the referenced files. | 4 / 5 |
Total | 18 / 20 Passed |