Content
82%Weight 40%Scale 1-5Reviews the quality of instructions and guidance provided to agents. Good implementation is clear, handles edge cases, and produces reliable results.
The body is a dense, actionable conversion guide with complete before/after examples, an exact parameter mapping, and genuinely non-obvious gotchas. Its main gaps are a missing end-of-workflow validation step and inline content (the full alerts example) that would be better split into a reference file.
Suggestions
Add an explicit validation step at the end of Conversion Steps, e.g. confirm the case-sensitive workbook display name exists in the Tableau project and run the pipeline once to verify the refresh triggers.
Trim the second on-success alert example (one alert block suffices to show the schema) and condense the auth version requirements into a single compact note.
Move the full alerts YAML schema to a reference file (e.g. references/alerts.md) and keep a one-line pointer inline, mirroring the existing deferral to the slack-dagster-to-orchestra skill.
| Dimension | Reasoning | Score |
|---|---|---|
Conciseness | Largely efficient — a one-sentence overview, a dense parameter mapping table, and non-obvious gotchas (PAT single in-flight request, Connected App version floors). Minor trimming opportunities remain: the second on-success alert example, duplicated `condition: null`/`tags: []` boilerplate across two YAML blocks, and inline version/date details ("Tableau Cloud (Dec 2025 release+) or Tableau Server 2025.3+") keep it below anchor 5. | 4 / 5 |
Actionability | Fully executable and copy-paste ready: complete before (runnable Python) and after (full pipeline YAML) examples, exact field names in the mapping table, a concrete UI path ("Settings -> Connections -> Tableau Cloud"), and coverage of both common cases (workbook refresh and datasource refresh via TABLEAU_REFRESH_EXTRACT). Matches anchor 5. | 5 / 5 |
Workflow Clarity | Four clearly sequenced steps (find workspace/assets, create/verify connection, replace asset with task, wire dependencies) with "Create/verify the Orchestra connection" as a checkpoint, but there is no explicit post-conversion validation step (e.g., run the pipeline or confirm the case-sensitive workbook display name) — a minor validation gap consistent with anchor 4 rather than 5. | 4 / 5 |
Progressive Disclosure | Well-organized sections with one-level-deep deferral ("See the `slack-dagster-to-orchestra` skill for full schema details" and external doc links), and no broken references since no bundle files exist. However, the full Adding Alerts section with a complete inline YAML example is content that could live in a reference file, and the skill is over 50 lines, so anchor 4 fits better than 5. | 4 / 5 |
Total | 17 / 20 Passed |