Content
65%Weight 40%Scale 1-5Reviews the quality of instructions and guidance provided to agents. Good implementation is clear, handles edge cases, and produces reliable results.
A well-structured instruction skill: genuinely non-obvious framework content, concrete gate criteria and cadence tables, and exemplary one-level-deep progressive disclosure backed by seven real reference files. The main gaps are rhetorical padding in the opening sections and an implicit rather than explicit workflow sequence with no plan-validation step.
Suggestions
Cut the rhetorical intro and the 'What this skill is' section down to a few lines — they restate the description; lead instead with 'Required inputs' followed by an explicit step sequence (inputs, 7 considerations, cadence template, output format).
State the execution order explicitly as a numbered workflow, and add a final validation step for the produced plan (e.g., verify every gate has measurable pass criteria and every lock point names its artifact and re-review scope).
Inline one short copy-paste example per platform (a Jira Epic field set, a Linear project/label setup, or a Playwright QA-gate invocation) so the body delivers on its 'MCP commands for setup' promise without forcing a reference-file hop.
| Dimension | Reasoning | Score |
|---|---|---|
Conciseness | The framework, cadences, and failure patterns are dense and skill-specific, but the two-paragraph rhetorical intro, the 'What this skill is' section restating the description, and aphorisms ('Gates that are not measurable become political') are tighten-able padding. Anchor 3 (mostly efficient, some unnecessary explanation) — not 2, since nothing explains concepts Claude already knows; not 4, since several passages could be cut without loss. | 3 / 5 |
Actionability | Concrete throughout for an instruction-only skill: 7 cadences with week ranges, measurable gate criteria ('Playwright critical-flow suite green, console error count at or below baseline'), the Todo/In Progress/Waiting/Blocked/Done taxonomy with agent permissions, an 8-section output format, and a 7-item required-inputs list. Anchor 4 (mostly executable, minor gaps) — not 5, because the promised 'ticket templates the PM can paste into Jira' and MCP commands appear only via reference pointers, not inline. | 4 / 5 |
Workflow Clarity | The procedure (gather inputs, apply the 7 considerations, select a cadence template, produce the 8-section plan) is implicit in the section ordering rather than stated as a sequence, and there is no validation of the produced plan (no check that gates are measurable or all output sections are populated). Anchor 3 (sequence present, checkpoints implicit) — not 4, which requires most checkpoints explicitly present. | 3 / 5 |
Progressive Disclosure | The body is an overview that summarizes each cadence and defers detail; a dedicated 'Reference files' section lists all 7 files with one-line descriptions; every referenced path resolves to a real, substantive file (verified against the bundle listing); references are exactly one level deep with no nested 'see X' chains. Matches anchor 5. | 5 / 5 |
Total | 15 / 20 Passed |