Content
86%Weight 40%Scale 1-5Reviews the quality of instructions and guidance provided to agents. Good implementation is clear, handles edge cases, and produces reliable results.
The body is a lean, well-sequenced, safety-conscious workflow that assumes Claude's competence and includes a genuinely executable backup script. The main gap is that the trickiest execution detail — selectively committing planned files or hunks onto new branches from a dirty working tree — remains abstract direction rather than a concrete, copy-paste-ready procedure.
| Dimension | Reasoning | Score |
|---|---|---|
Conciseness | Every line is load-bearing — e.g., "Stage only named files or hunks. No `git add .` / `git add -A`." — and the body assumes Claude's git competence, never re-explaining what PRs, stashing, or CODEOWNERS are. Matches the lean-and-efficient anchor 5; there is no padding to trim. | 5 / 5 |
Actionability | The snapshot block (`git stash create "pre-split"`, `git update-ref "refs/backup/pre-split-$(date +%s)"`) is complete, executable, and even handles the no-uncommitted-work case, and staging rules are concrete. Not 5 because the hardest mechanism — "create a branch from the right base, stage and commit only the planned files or hunks" from a possibly dirty tree — is left as high-level direction with no concrete recipe (e.g., how to commit specific hunks non-interactively); mostly executable with minor gaps, anchor 4. | 4 / 5 |
Workflow Clarity | A clear numbered 1-4 sequence with explicit checkpoints: the approval gate ("Do not create branches, commit, push, or open PRs until the user approves the split plan", "Ask for approval before starting"), the pre-split snapshot, and the report-back step surfacing leftovers. Not 5 because there are no error-recovery feedback loops and no per-slice verification (e.g., checking a slice's diff contains only planned files before pushing); anchor 4 with minor validation gaps. | 4 / 5 |
Progressive Disclosure | The body is under 50 lines, needs no external references (none exist in the bundle), and is cleanly organized into Hard rules plus four numbered sections. Per the simple-skill guidance, this earns anchor 5 on well-organized sections alone. | 5 / 5 |
Total | 18 / 20 Passed |