Parallel Execution Reference

Detailed protocol for dispatching [P] tasks concurrently via subagents during implementation.

Capability Detection

Determine whether your runtime supports concurrent subagent dispatch:

  • Can dispatch concurrently: You have a tool or mechanism to launch multiple independent agents that run simultaneously (e.g., Claude Code Task tool, OpenCode parallel workers).
  • Cannot dispatch concurrently: Sub-agents run sequentially, or no subagent mechanism exists (e.g., Gemini CLI, Codex CLI).

If concurrent dispatch is unavailable, execute all tasks sequentially. The rest of this document still applies — batches simply run one task at a time.

Orchestrator/Worker Model

The orchestrator is the main agent running the implement skill. Workers are subagents dispatched for individual tasks.

Orchestrator Responsibilities

  • Parse tasks.md and build the task graph
  • Group [P] tasks into parallel batches
  • Dispatch workers with appropriate context
  • Collect worker results
  • Write to tasks.md (mark tasks [x]) — only the orchestrator does this
  • Detect file conflicts between worker outputs
  • Halt on failure, advance on success

Worker Responsibilities

  • Implement the assigned task (write code, create files, run tests)
  • Report back: success/failure, files created/modified, errors encountered
  • Do NOT write to tasks.md — report completion to the orchestrator
  • Check constitutional rules before every file write — same enforcement as §6 of the implement skill
  • Query Tessl tiles independently if needed

Subagent Context Construction

Each worker subagent must receive sufficient context to implement its task independently.

Mandatory context (always include):

  • Constitutional enforcement rules (extracted MUST/SHALL/REQUIRED statements)
  • The specific task description from tasks.md
  • Relevant sections from spec.md (the user story this task belongs to)
  • Technical context from plan.md (tech stack, project structure, conventions)

Conditional context (include when relevant):

  • Data model definitions from data-model.md (if task involves models/entities)
  • API contracts from contracts/ (if task involves endpoints)
  • Test specifications from tests/test-specs.md (if task involves tests)
  • Tessl tile availability info (if Tessl is installed)

Keep context focused — a worker implementing a single model file does not need the full API contract catalog.

Within-Phase Protocol

For each phase:

  1. Identify eligible tasks: Tasks whose dependencies are all marked [x]. Tasks already marked [x] are complete and never re-executed. If a phase has zero tasks (or all tasks are already [x]), the phase is immediately complete — advance to the next phase.
  2. Partition into batches:
    • All eligible [P] tasks with no mutual dependencies form a batch
    • Non-[P] tasks run individually in dependency order (use task ID as tiebreaker when multiple siblings are eligible at the same depth)
    • If two [P] tasks share a dependency on each other, they cannot be in the same batch
    • Dispatch priority: If both a [P] batch and non-[P] individual tasks are eligible in the same iteration, dispatch the [P] batch first. Non-[P] tasks are dispatched in subsequent iterations after the batch completes.
  3. Dispatch batch:
    • Launch one worker per task in the batch
    • Workers execute concurrently (or sequentially in fallback mode)
  4. Collect results: Wait for all workers in the batch to complete
  5. Post-batch checks:
    • Run file conflict detection (see below)
    • If TDD active, run full test suite after batch (see TDD section)
  6. Checkpoint: Mark completed tasks [x] in tasks.md in a single write, then commit each task individually per §5.6
  7. Repeat with remaining and newly eligible tasks until the phase is complete

Cross-Story Protocol

After Phase 2 (Foundational) completes, independent user stories may execute as parallel workstreams.

Eligibility check:

  • Two story phases are independent if they share no task-level dependencies
  • Verify no two stories modify the same files (check task descriptions for file paths)
  • If stories share a foundational dependency, it must already be complete (Phase 2)

If eligibility fails: Do not use cross-story parallelism. Execute story phases in their defined order (the default phase-by-phase behavior). Intra-phase [P] batching still applies within each story phase.

Dispatch:

  • Each workstream runs its story phase end-to-end (batches within)
  • The orchestrator monitors all workstreams
  • Each workstream reports progress independently

Completion:

  • When a workstream finishes, the orchestrator marks its tasks [x]
  • Run file conflict detection across workstream outputs
  • Continue with the Final (Polish) phase only after all workstreams complete

Workstream failure: If a workstream fails, let other running workstreams finish. Mark their completed tasks [x]. Halt before the Final phase and report which workstream failed and why. After the user fixes the issue, resume only the failed workstream from its last checkpoint.

File Conflict Detection

File conflicts are checked at two points:

Pre-dispatch (best-effort): Before dispatching a batch or cross-story workstreams, check task descriptions for overlapping file paths. This catches obvious conflicts but is not exhaustive — task descriptions may not list every file a worker will create or modify. If pre-dispatch detects overlapping file paths, exclude the conflicting tasks from the batch and schedule them sequentially after the batch completes. Non-conflicting tasks in the batch proceed as planned.

Post-batch (definitive): After each parallel batch or cross-story workstream completes:

  1. Collect the list of files actually created or modified by each worker
  2. Check for overlapping file paths between workers in the same batch
  3. If overlap detected:
    FILE CONFLICT: src/models/user.py modified by T005 and T008
    Resolution required before proceeding.
  4. Mark non-conflicting tasks [x]. Leave conflicting tasks unmarked until resolved.
  5. Resolve by manually merging the changes, or sequentially re-run the conflicting tasks. Mark them [x] after resolution.

TDD in Parallel Context

When TDD is active (test-specs.md exists):

Per-worker: Each worker follows the red/green cycle for its task:

  • RED task (write test): Write test, run it, verify it fails (no implementation yet)
  • GREEN task (implement): Write code, run test, verify it passes
  • Workers can run tests for their own scope concurrently

Post-batch (orchestrator): After a batch completes, run all tests that exist so far (not just the batch's tests) to catch integration issues between parallel implementations:

POST-BATCH TEST RUN: Batch N
Running all existing tests... X tests passed, Y failed

RED-phase batches: If all tasks in the batch are RED-phase (test-writing) tasks, test failures are expected — the halt condition does not apply. Instead, verify the new tests fail as expected and proceed. If any test unexpectedly passes during a RED-phase batch, halt and investigate (may indicate stale implementation code or an incorrect test).

GREEN-phase and mixed batches: If post-batch tests fail, halt and investigate before starting the next batch. Failures may indicate a file conflict or incompatible implementations between workers.

Tessl in Parallel Context

When Tessl tiles are installed:

  • Each worker queries mcp__tessl__query_library_docs independently for its own task
  • Workers should not duplicate queries already made by the orchestrator
  • The orchestrator aggregates Tessl usage tracking across all workers for the final report:
    TESSL_USAGE.documentation_queries += worker.queries
    TESSL_USAGE.skills_invoked += worker.skills