The team's Definition of Done (DoD), both halves of the lifecycle: authoring and auditing. Explains the Scrum Guide's DoD definition ("a formal description of the state of the Increment when it meets the quality measures required for the product"), proposes a starter DoD with the 7-10 lines most teams need (code reviewed, unit tests, docs, AC met, deployed to staging, smoke passed, no a11y regressions, telemetry wired), emits a per-PR checklist a reviewer enforces, and audits work against an existing DoD line by line with repository evidence (review records, diffs, CI runs, coverage reports), tagging every line met, not met, or unverifiable - never passing a line on self-attestation. Use when the team doesn't have a DoD, wants to revise theirs, or is about to mark a story or PR done and nobody has checked the work against the committed checklist.
75
94%
Does it follow best practices?
Run evals on this skill
Adds up to 20 points to the overall score
View guide
Passed
No findings from the security scan
Tessl evals compare success rates of agents with and without our optimized context