CtrlK
BlogDocsLog inGet started
Tessl Logo
PluginPublic

testland/exec-quality-narrative

Use before a QBR, board update or exec review when quality data exists (digests, KPIs, DORA metrics, escaped defects, OKR grades) but the story does not. Writes the executive narrative with the answer first and grouped support beneath it, using the Minto Pyramid and SCQA.

Quality

92%

Does it follow best practices?

Run evals on this skill

Adds up to 20 points to the overall score

View guide
SecuritybySnyk

Passed

No findings from the security scan

Overview
Quality
Evals
Security
Files

dora-metrics.mdreferences/

DORA software delivery metrics - verbatim definitions

Executives increasingly hear DORA terms from engineering leadership, so use them precisely. DORA measures software delivery performance. Its current guidance documents five metrics, described as having evolved "from the original four keys to the current five-metric model", grouped as throughput and instability (https://dora.dev/guides/dora-metrics-four-keys/, verified 2026-07-19).

The quoted block below is duplicated verbatim in quality-status-digest/references/dora-metrics.md; update both together.

Throughput

  • Change lead time (originally "lead time for changes"): "The amount of time it takes for a change to go from committed to version control to deployed in production."
  • Deployment frequency: "The number of deployments over a given period or the time between deployments."
  • Failed deployment recovery time: "The time it takes to recover from a deployment that fails and requires immediate intervention."

Instability

  • Change fail rate (originally "change failure rate"): "The ratio of deployments that require immediate intervention following a deployment."
  • Deployment rework rate: "The ratio of deployments that are unplanned but happen as a result of an incident in production."

Notes for the narrative

  • The original set was "the four keys"; failed deployment recovery time is the renamed recovery metric. If leadership still says "the four keys", name the rename rather than silently mixing old and new labels.
  • Deployment frequency and change fail rate travel best into an exec narrative: they need only deployment records and incident flags. Change lead time and failed deployment recovery time depend on commit and incident conventions, so mark them partial rather than guessing.
  • Escape-defect rate is a defect-leakage metric, not a DORA metric. Keep it beside the DORA figures, never inside them, or one informed exec follow-up sinks the room's trust.

SKILL.md

tile.json