CtrlK
BlogDocsLog inGet started
Tessl Logo
PluginPublic

testland/experiment-results-interpreter

Use when an A/B test result is read for a ship decision, especially off a dashboard, a small sample or many metrics. Computes significance per metric with multiple-comparison correction, reads confidence intervals, checks novelty, interactions, Simpson's paradox, guardrails and stop-early rules.

Quality

85%

Does it follow best practices?

Run evals on this skill

Adds up to 20 points to the overall score

View guide
SecuritybySnyk

Passed

No findings from the security scan

Overview
Quality
Evals
Security
Files

significance-anti-patterns.mdreferences/

Significance-check anti-patterns

Each row maps a common analysis mistake to the step that prevents it.

Anti-patternWhy it failsFix
Peeking and stopping at first significanceInflates false-positive rate dramatically.Pre-register stop date OR use sequential testing (Step 7).
Single metric onlyMisses regressions in secondary metrics (revenue down even though completion up).5-10 metrics including guardrails (Step 1).
No multiple-comparisons correction10 metrics × α=0.05 = 40% chance of false positive somewhere.FDR / Bonferroni (Step 3).
Ship based on practical significance without statisticalRandom variance gets shipped as "lift."Both required (Step 5).
Ship based on statistical significance without practical0.1% lift at N=10M ships; not worth maintenance burden.MDE per metric (Step 5).
Welch's t-test on heavy-tailed metrics (revenue)Test invalid; conclusion wrong.Mann-Whitney U for non-normal metrics (Step 2).
Ignoring guardrail metrics (support tickets, churn, refund rate)Ship something that breaks downstream.Always include guardrails (Step 6 example).

SKILL.md

tile.json