CtrlK
BlogDocsLog inGet started
Tessl Logo

testland/risk-matrix

The risk-based testing (RBT) umbrella: risk matrix and risk register authoring, likelihood x impact scoring, risk storming, calibration, and risk-to-test coverage mapping. Produces the per-feature / per-release matrix artifact (structured intake: feature, category, impact 1-5 by likelihood 1-5, score; heatmap; mitigations with owners and due dates), supporting lightweight and heavyweight (FMEA / Cost of Exposure) methods per RBT canon, plus a risk coverage mapping workflow that proves which tests, cases, or monitors back each registered risk. references/ carries the product-risk and project-risk register variants, the risk-storming facilitation guide, matrix calibration against observed defect data, and a register review checklist. Use for any risk-based-testing artifact: building a matrix or register, running a risk-storming session, calibrating ratings against defects, or mapping risks onto test coverage.

69

Quality

87%

Does it follow best practices?

Run evals on this skill

Adds up to 20 points to the overall score

View guide

SecuritybySnyk

Passed

No findings from the security scan

Overview
Quality
Evals
Security
Files

product-risk-register.mdreferences/

Product risk register

Deep reference for the risk-matrix SKILL.md. The product-level register variant: long-lived product-quality risks (functionality, performance, security, usability, compatibility, reliability) that persist across releases, distinct from the per-release matrix the spine builds. Both feed risk-based test selection and planning.

Per ISTQB CTAL-TM syllabus chapter 5 on risk-based testing and ISO 31000:2018 (risk management) - cite by stable ID; ISO behind paywall.

When to build one

  • Onboarding a new test lead - establish the product-quality risk baseline.
  • Quarterly product-quality review - re-score persistent risks.
  • Compliance audit - document long-lived product risks beyond the current release.
  • Seeding a new release matrix - copy persistent risks forward, add release-specific ones.

Step 1 - Identify risks by quality characteristic

Walk through ISO 25010 quality characteristics. For each, ask: "What could go wrong here in this product?"

CharacteristicExample product risks
Functional suitabilityCore business logic incorrectness (pricing, tax, compliance calculations)
Performance efficiencySustained load failure; large-dataset slowness; cold-start latency
CompatibilityBrowser / OS / device fragmentation; third-party API drift
UsabilityAccessibility (WCAG conformance); learnability for new users; error messaging
ReliabilityRecovery from upstream failures; data durability; transactional integrity
SecurityAuth / authz; PII exposure; injection vulnerabilities; supply chain
MaintainabilityTech debt accumulating in critical paths; test brittleness
PortabilityMigration between cloud providers; export/import data integrity

Per ISO/IEC 25010:2023 quality model (cite by stable ID).

Aim for 15-30 product-level risks. Fewer than 10 = too sparse; more than 50 = mix with per-release risks.

Step 2 - Score per impact × likelihood

Use the same 1-5 scale as the spine's matrix. Score is impact × likelihood:

ScoreTierAction
15-25CriticalContinuous monitoring + multiple mitigations + quarterly review
10-14HighAt least one strong mitigation + annual review
5-9MediumDocumented mitigation strategy + biannual review
1-4LowAcknowledged; mitigation optional

Step 3 - Document the register

# Product risk register - <product-name>

**Last reviewed:** YYYY-MM-DD  **Owner:** <name>  **Next review:** YYYY-MM-DD

## Active risks (n=22)

| ID | Category (ISO 25010) | Risk | Impact | Likelihood | Score | Mitigation(s) | Owner | Last review |
|---|---|---|---:|---:|---:|---|---|---|
| PR-001 | Functional suitability | Pricing engine off-by-cent in EU markets | 5 | 3 | 15 | Property-based testing on rounding; nightly compliance test suite | Alice | 2026-05-01 |
| PR-002 | Security | OAuth refresh-token leak via logs | 5 | 2 | 10 | Log redaction middleware; quarterly secret-scan; presidio-pii-detection in CI | Bob | 2026-04-15 |
| PR-003 | Reliability | Stripe webhook delivery failure not retried | 4 | 4 | 16 | DLQ + retry; chaos test in staging weekly | Carol | 2026-05-10 |
| PR-004 | Performance | Catalog search slows under >10k SKUs | 4 | 3 | 12 | Elasticsearch tuning; k6 load test gate | Dan | 2026-03-20 |
| ... | ... | ... | ... | ... | ... | ... | ... | ... |

## Retired risks (n=5)

| ID | Risk | Retired date | Why retired |
|---|---|---|---|
| PR-R-001 | Legacy SOAP API maintenance | 2026-02-01 | API decommissioned in v3.0 |
| ... | ... | ... | ... |

Step 4 - Link mitigations to test coverage

For each active risk, name at least one mitigation and link it to existing test coverage (or flag a gap):

| PR-001 | Pricing engine off-by-cent | 15 | Tests: tests/billing/test_promo_stacking.py + nightly compliance suite (PROJ-T123 + 124) | Alice |

Use the risk coverage mapping workflow in SKILL.md to generate the test-to-risk map.

Step 5 - Quarterly review

Per ISTQB CTAL-TM, product risks should be re-scored at least quarterly:

## Q2 2026 review log

- **PR-001**: Impact unchanged (5); likelihood **lowered 3 → 2**
  (property-based tests in place + 6 months no incidents). New
  score: 10 (was 15).
- **PR-003**: Impact unchanged (4); likelihood **raised 4 → 5**
  after Q1 webhook outage at provider. New score: 20 (was 16).
- **PR-007**: **Retired** - feature deprecated in v3.0.
- **New: PR-022**: Locale-related date formatting; impact 3,
  likelihood 3, score 9. Owner: Eve.

Net change: 1 new, 1 retired, 1 risen, 1 lowered. Total active: 22.

Step 6 - Seed the release matrix

When a release matrix starts:

  1. Copy product risks scoring ≥10 (High + Critical tier) into the release matrix.
  2. Identify release-specific risks beyond the persistent ones (per the release's feature set).
  3. Assign the release-specific testing strategy per SKILL.md Step 4.

Worked example - e-commerce product

A 24-risk register might decompose like:

CategoryCountAvg score
Functional suitability613
Performance311
Security514
Reliability412
Compatibility39
Usability28
Maintainability16

Distribution suggests Security + Functional suitability are the top areas to invest in.

Anti-patterns

Anti-patternWhy it failsFix
One-time creation, never reviewedRegister becomes staleQuarterly review cadence
Mixing per-release risks into the product registerConfuses long-lived from transientPer-release risks in the release matrix; product-level here
No retired-risks sectionHistory lost; "why did we stop testing X?" unansweredAlways keep a retired-risks log
Score without recent re-reviewStale scores misinform planning"Last review" date column; auto-flag stale entries
Mitigation missing test coverage linkMitigation is theoretical; no evidence it worksAlways link mitigation → test (or flag as gap)
ISO 25010 categories unusedRisk list skewed to functional onlyWalk all 8 characteristics
Risk register in a wiki page that nobody opensEffectively shelf-wareVersioned in repo; reviewed at sprint planning

Limitations

  • Subjective scoring. Impact × likelihood depends on judgment; inter-rater agreement is moderate. Use the rubric anchors in SKILL.md Step 2.
  • Quarterly cadence is a floor. Volatile products may need monthly; mature products may extend to annual.
  • Doesn't replace per-feature analysis. Product risks are high-altitude; per-feature risk analysis happens at release.
  • Mitigation linkage is one-directional. Test coverage may exceed risk mitigation (defensible: unconnected coverage isn't bad). Reverse - risks without coverage - needs explicit attention.

References

  • ISTQB Advanced Test Manager (CTAL-TM) syllabus, ch. 5 on risk-based testing.
  • ISO 31000:2018 "Risk management - Guidelines" - cite by stable ID; iso.org paywall.
  • ISO/IEC 25010:2023 "Systems and software engineering - Systems and software Quality Requirements and Evaluation (SQuaRE) - Product quality model" - cite by stable ID.
  • ISTQB Glossary - glossary.istqb.org - "product risk", "project risk", "risk identification".
  • Sibling reference (different scope): project-risk-register.md - project-level: schedule, env, people.

SKILL.md

tile.json