Build-an-X workflow that produces the manager's prep pack for the QA - SRE - Product SLO conversation - current error-budget consumption + MTTR/MTBF trend + a single framed decision question + an explicit 3-5 option matrix with reversibility / stakeholder cost / impact scoring + recommended posture with cited alternatives. Consumes existing SLI / SLO / error-budget math and per-incident MTTR / MTBF metrics rather than computing them. Use when budget is burning or a proposed change will stress the SLO - the output is the evidence pack the manager carries into the meeting, not a recommendation about which option to pick.

64

Quality

81%

Does it follow best practices?

Run evals on this skill

Adds up to 20 points to the overall score

View guide

SecuritybySnyk

Passed

No findings from the security scan

Overview
Quality
Evals
Security
Files

worked-example.mdreferences/

Worked example (illustrative, dated)

A complete run of slo-negotiation-prep for one scenario: SLO 99.9%, 56% of the quarterly error budget consumed at 16% of the quarter, with Feature X under a two-week timeline pressure. The dates and incident ids below (2026-Q3, INC-2026-18xx, commit e3a91f4) are sample values for this one run - substitute your own service, window, and incident log. The example walks Steps 2 to 5 end to end.

Step 2 output - current-state evidence pack

## Current state - `<service>` - 2026-07-15 (budget window: 2026-Q3 to date)

### SLO
99.9% successful_requests / total_requests, 30-day rolling window

### Error-budget consumption
- Budget for the quarter: 0.1% × 90 days = ~129.6 minutes of "unreliability allowed"
- Consumed to date (Jul 1 - Jul 15): 73 minutes (56% of quarterly budget in 16% of the quarter)
- **Burn-rate alert status**: SEV2 burn-rate fired 2026-07-08, SEV2 burn-rate fired 2026-07-12 (both per `error-budget-tests` configured alerts)

### MTTR / MTBF trend (2026-Q3 to date)
- MTTR (mean time to recover): 22 minutes (vs 18 min Q2 trailing average)
- MTBF (mean time between failures): 4.1 days (vs 9.2 days Q2 trailing average)
- Trend: **MTBF degrading sharply, MTTR slightly degrading** - frequency is the bigger problem than recovery time

### Top contributing incidents (cited)
- 2026-07-08 - payment-service 5xx surge, 28-min consumption - root cause: third-party provider degradation. Per `mttr-mtbf-tracker` incident #INC-2026-1834.
- 2026-07-12 - cart-service deploy regression, 32-min consumption - root cause: missing migration assertion in canary. Per incident #INC-2026-1851.
- 2026-07-14 - inventory-cache cold-start latency, 13-min consumption - root cause: capacity planning miss. Per incident #INC-2026-1862.

### Source citations
- `error-budget-tests` config: `slo-config.yaml` (commit `e3a91f4`)
- `mttr-mtbf-tracker` incident log: `incidents/2026-Q3.json`
- Alert history: PagerDuty export 2026-07-01..2026-07-15

Step 3 output - filled option matrix

## The decision

**Question:** Can we ship Feature X in 2 weeks given current SLO posture (56% budget consumed in 16% of quarter)?

**Decision deadline:** 2026-07-29 (timeline pressure: Feature X has external launch commitments).

## Option matrix

| # | Option | Impact (user-facing) | Reversibility | Stakeholder cost |
|---|---|---|---|---|
| O1 | **Ship Feature X on the original timeline, accept the burn** | Possible further budget consumption; user-facing if budget exhausts before quarter-end | High - reversible at next budget window | Low product cost; **high SRE cost** (more incidents to triage); medium QA cost |
| O2 | **Defer Feature X by 2 weeks; spend the budget on reliability fixes first** | Lower budget burn; user-facing delay on Feature X | High - defer is reversible; Feature X re-scheduled | High product cost; low SRE cost; low QA cost |
| O3 | **Freeze releases for 1 week, then ship Feature X** (per [Google SRE Workbook](https://sre.google/workbook/implementing-slos/) standard response #3) | One week of zero deploys; reliability investment | High - freeze is by definition temporary | Medium product cost (only 1 week delay); medium SRE cost (compresses fix window) |
| O4 | **Extend the quarterly budget by 30 min** (temporary SLO relaxation) | Allows Feature X to ship without freeze, but sends a signal that SLOs are negotiable under pressure | **Low** - budget extensions tend to become permanent if not reversed at quarter-end | Low product cost short-term; **high SRE cost long-term** (erodes the SLO discipline) |
| O5 | **Lower the SLO to 99.5% permanently** (renegotiate) | Reflects current reality if the 99.9% target was never matched. User-visible if the SLO was published. | **Low** - SLO changes are sticky | High SRE cost (signals defeat); medium product cost (may damage customer commitments); medium QA cost |

Step 4 output - recommended posture

## Recommended posture

**Primary recommendation: O3 (1-week freeze + ship Feature X)**

**Why:**
- Current burn rate (56% in 16% of quarter) projects to ~350% of budget by quarter-end if unmitigated - per `error-budget-tests` projection.
- 2 of the 3 top incidents have known reliability fixes in flight (incidents INC-2026-1851 cart-deploy and INC-2026-1862 inventory-cache); a 1-week focused fix window addresses them.
- Per [Google SRE Workbook](https://sre.google/workbook/implementing-slos/), production freeze is the canonical response: "halts certain changes to the system until there is sufficient error budget to resume changes."
- O3 preserves reversibility (a 1-week freeze is short, easy to extend or shorten).

**Fallback alternative: O2 (defer Feature X by 2 weeks, no freeze)**

**When to fall back:**
- If Product's external commitments cannot accommodate a 1-week-freeze schedule, O2 buys the same reliability time without the freeze signalling cost.
- Trade-off: a longer Feature X delay; the SRE team's fix window is wider but less concentrated.

**Reject these options (with reasoning):**
- **O4 (extend budget)**: budget extensions are sticky per the Workbook's bidirectional-iteration framing; the team should resist short-term SLO relaxation under pressure.
- **O5 (lower SLO permanently)**: not justified by 2 weeks of data; SLO renegotiation requires 1-2 quarters of evidence the target no longer matches reality.

**Stakeholder positions to anticipate:**
- **Product PM**: likely to favour O1 (ship on time, accept burn). The data argument is: 350% projected burn signals systemic risk, not occasional unreliability.
- **SRE lead**: likely to favour O3 or stricter (longer freeze). The middle-ground argument is: O3 gives SRE the focused fix window without weeks of product delay.
- **Engineering manager**: likely neutral; will weight reversibility highest. Both O2 and O3 score well on reversibility.

**What the manager advocates for**: O3 as primary, O2 as the negotiated fallback if Product cannot accept the freeze.

Step 5 output - audit appendix

## Audit appendix

| Claim | Source |
|---|---|
| 56% budget consumed by 2026-07-15 | `error-budget-tests` daily snapshot 2026-07-15 |
| 350% projected burn at current rate | Linear extrapolation: 56% × (90/15 days) ≈ 336% - cited to `error-budget-tests` projection function |
| Top incidents | `mttr-mtbf-tracker` incident log 2026-Q3, filter(severity=SEV2, contributed_to_budget=true) |
| Standard responses per SRE Workbook | https://sre.google/workbook/implementing-slos/ §error-budget-policy |
| Reversibility scoring (Step 3) | Heuristic per skill body §Step 3; team can adjust |
| Stakeholder cost (Step 3) | Heuristic; team's actual stakeholder dynamics may differ - flag for confirmation |
| Recommended posture (Step 4) | Cited inline; manager confirms before walking into the meeting |

Summary: 5-option matrix, recommended posture (1-week freeze + ship), fallback (defer 2 weeks, no freeze), rejected options (extend budget / lower SLO) with cited rationale, and anticipated stakeholder positions. The manager walks in with structured evidence; the meeting decides; the retro audits the decision against the pack.