Skill | Added | Review |
|---|---|---|
arn-code-batch-planning This skill should be used when the user says "batch planning", "batch plan", "arness batch planning", "arn-code-batch-planning", "plan multiple features", "plan all features", "plan unblocked features", "plan the backlog", "plan from backlog", "batch spec and plan", "plan next features", "sequential planning", "multi-feature plan", "plan the next batch", "plan these features", "batch plan GitHub issues", "batch plan from Jira", "plan issues in batch", or wants to plan multiple features from the greenfield Feature Tracker, GitHub issues, or Jira issues in a single session. Pre-analyzes all selected features in parallel, then guides sequential spec review with pipelined plan generation. This skill is typically invoked directly or after arn-brainstorming completes and chains to arn-code-batch-implement upon completion. For single-feature planning, arn-planning is the correct entry point. | 77 Impact — No eval scenarios have been run Securityby Advisory Suggest reviewing before use Reviewed: Version: 1fe948f | |
arn-spark-stress-prfaq This skill should be used when the user says "prfaq", "pr faq", "pr/faq", "press release stress test", "stress prfaq", "amazon pr faq method", "test the pitch with a pr/faq", "validate concept through pr/faq", "critique press release", "pr faq stress test", "will this marketing story hold up", or wants to stress-test a product concept by drafting a compelling press release and FAQ, then adversarially critiquing it to find where the concept cracks under scrutiny. Produces a PR/FAQ report with the full draft, adversarial questions, crack point analysis, and recommended concept updates. | 90 Impact — No eval scenarios have been run Securityby Passed No known issues Reviewed: Version: 1fe948f | |
arn-spark-stress-interview This skill should be used when the user says "stress interview", "synthetic interview", "user interview stress test", "interview my personas", "test with synthetic users", "persona interview", "simulate user interviews", "run user interviews", or wants to stress-test a product concept by conducting structured interviews with synthetic personas through three adversarial lenses (Pragmatist, Skeptic, Power User). Produces an interview report with per-persona findings, synthesized themes, and recommended concept updates. | 93 Impact — No eval scenarios have been run Securityby Passed No known issues Reviewed: Version: 1fe948f | |
arn-spark-feature-extract This skill should be used when the user says "feature extract", "arn feature extract", "extract features", "feature backlog", "create backlog", "list features", "what features do we need", "prioritize features", "feature list", "build the backlog", "what should we build", "upload features", "feature tracker", or wants to extract a structured, prioritized feature list with journey steps, validated components, use case context, and UI behavior details from all project artifacts, producing a feature backlog document with a Feature Tracker that bridges into arn-code-feature-spec and optionally uploads features to the issue tracker. | 78 Impact — No eval scenarios have been run Securityby Passed No known issues Reviewed: Version: 1fe948f | |
arn-infra-monitor This skill should be used when the user says "set up monitoring", "arn infra monitor", "infra monitor", "configure monitoring", "set up observability", "add logging", "configure alerting", "set up alerts", "infrastructure monitoring", "add metrics", "set up cloudwatch", "configure grafana", "observability setup", "logging setup", "alerting setup", "health checks", "monitor infrastructure", "arn-infra-monitor", "set up cloud monitoring", "configure notifications", "prometheus", "datadog", "new relic", "sentry", or wants to set up logging, metrics collection, and alerting for their deployed infrastructure. | 66 Impact — No eval scenarios have been run Securityby Passed No known issues Reviewed: Version: 1fe948f | |
arn-spark-clickable-prototype-teams This skill should be used when the user says "clickable prototype teams", "arn clickable prototype teams", "team clickable prototype", "debate clickable prototype", "collaborative interaction review", "clickable prototype with debate", "team-based interaction review", "interaction debate", "review interactions as a team", "interactive prototype teams", "team prototype review", or wants to create a clickable interactive prototype with linked screens and validate it through iterative expert debate cycles where product strategist and UX specialist discuss their scores and findings before producing a combined review, with Playwright-based interaction testing, per-criterion scoring, an independent judge verdict, and versioned output. Supports Agent Teams for parallel debate or sequential simulation as fallback. For standard lower-of-two-scores interaction review, use /arn-spark-clickable-prototype instead. | 71 Impact — No eval scenarios have been run Securityby Advisory Suggest reviewing before use Reviewed: Version: 1fe948f | |
arn-code-document-project This skill should be used when the user says "document project", "generate docs", "create documentation", "write docs", "arness code document", "arn-code-document-project", "document this feature", "document this fix", or wants to generate developer documentation for a completed feature or bug fix. Reads plan artifacts, spec files, execution reports, and git diff to produce accurate documentation. Do NOT use this for general-purpose documentation — this is specifically for Arness pipeline projects. | 86 Impact — No eval scenarios have been run Securityby Passed No known issues Reviewed: Version: 1fe948f | |
arn-infra-init Optional customization tool for infrastructure projects. This skill should be used when the user says "infra init", "arn infra init", "initialize infra", "setup infrastructure", "arn-infra-init", "configure infra", "init infra", "infrastructure setup", "set up infrastructure", "infra setup", "start infra", "configure arn infra", "add infrastructure to this project", "review infra config", "customize infra config", "infra settings", or wants to configure providers, environments, IaC tools, CI/CD platform, or review current infrastructure settings. Arness Infra auto-configures with sensible defaults on first skill invocation — this init is optional for basic usage but required for provider/environment configuration. | 74 Impact — No eval scenarios have been run Securityby Passed No known issues Reviewed: Version: 1fe948f | |
arn-spark-discover This skill should be used when the user says "discover", "product discovery", "arn discover", "help me define this product", "what should I build", "product concept", "define the product", "let's figure out what to build", "vision for this project", "shape this idea", "new project idea", "brainstorm this product", "starting from scratch", or wants to explore and structure a greenfield product idea through guided conversation. Produces a product-concept.md document capturing the product vision, core experience, target users, trust model, platforms, and scope boundaries. | 74 Impact — No eval scenarios have been run Securityby Advisory Suggest reviewing before use Reviewed: Version: 1fe948f | |
arn-infra-change-spec This skill should be used when the user says "infra change spec", "infrastructure change", "specify infrastructure change", "change spec", "arn infra spec", "describe infra change", "what infrastructure needs to change", "infra spec", "spec this infra change", "write infra spec", "infrastructure change specification", "create infra change spec", "upgrade to pipeline", "convert to pipeline", or wants to iteratively develop an infrastructure change idea into a well-formed specification through guided conversation, or wants to upgrade existing interactive IaC artifacts into the structured change pipeline. | 72 Impact — No eval scenarios have been run Securityby Passed No known issues Reviewed: Version: 1fe948f | |
arn-code-save-plan This skill should be used when the user says "save plan", "save the plan", "arness code save plan", "structure this plan", "create project from plan", "export plan", "export project plan", "organize this plan", "set up project structure", "turn this into a project", "generate project structure", "finalize the plan", or wants to convert a planning conversation into an actionable phased project structure with implementation and testing plans. | 83 Impact — No eval scenarios have been run Securityby Passed No known issues Reviewed: Version: 1fe948f | |
arn-infra-deploy This skill should be used when the user says "deploy", "deploy to staging", "deploy to production", "promote to production", "infra deploy", "arn infra deploy", "deploy infrastructure", "apply infrastructure", "push to prod", "go live", "tofu apply", "terraform apply", "pulumi up", "cdk deploy", "fly deploy", "deploy to railway", "release to prod", "promote environment", or wants to execute a deployment of their infrastructure to a target environment. This skill handles environment promotion, CI/CD enforcement, cost gates, safety layers, and resource tracking. | 80 Impact — No eval scenarios have been run Securityby Passed No known issues Reviewed: Version: 1fe948f | |
arn-infra-refresh This skill should be used when the user says "refresh infra references", "update tool versions", "check for new MCPs", "update infra patterns", "refresh registries", "arn infra refresh", "infra refresh", "update references", "check for updates", "refresh infrastructure tools", "update MCP servers", "refresh CLI versions", "update base images", "arn-infra-refresh", or wants to update the version-sensitive infrastructure reference files (tool versions, MCP packages, CLI commands, base image tags, IaC patterns) using online research. | 83 Impact — No eval scenarios have been run Securityby Advisory Suggest reviewing before use Reviewed: Version: 1fe948f | |
arn-spark-report This skill should be used when the user says "spark report", "report spark issue", "spark broke", "arn-spark-report", "greenfield issue", "report greenfield problem", "report spark problem", "diagnose spark", "spark doctor", "spark bug", "spark not working", or wants to report a problem with an Arness Spark workflow skill. Invokes the arn-spark-doctor agent to diagnose the issue, then files a GitHub issue on the Arness plugin repository. Do NOT use this for filing issues on the user's own project — use /arn-code-create-issue for that. | 93 Impact — No eval scenarios have been run Securityby Passed No known issues Reviewed: Version: 1fe948f | |
arn-infra-document-change This skill should be used when the user says "document infra change", "infrastructure documentation", "generate runbook", "infra docs", "arn infra document", "create infra changelog", "document infrastructure", "generate infrastructure docs", "infra documentation", "create runbook", "generate changelog", "arn-infra-document-change", or wants to generate operational documentation (runbooks, architecture updates, changelogs, environment docs) from completed infrastructure changes. | 86 Impact — No eval scenarios have been run Securityby Passed No known issues Reviewed: Version: 1fe948f | |
arn-code-assess This skill should be used when the user says "arness code assess", "arn-code-assess", "assess codebase", "technical review", "codebase assessment", "find improvements", "what should I improve", "tech debt review", "tech debt audit", "pattern compliance check", "codebase health check", "assess the project", "improvement plan", "review my codebase", "what needs fixing", "code quality check", "audit my code", "run an assessment", or wants a comprehensive technical assessment of the codebase against stored patterns followed by prioritized improvement execution through the full Arness pipeline. | 71 Impact — No eval scenarios have been run Securityby Passed No known issues Reviewed: Version: 1fe948f | |
arn-infra-ensure-config This skill should be used when the user says "ensure config", "check arn infra config", "arn-infra-ensure-config", "verify arn infra setup", or wants to verify that Arness Infra configuration is present for the current project. This skill is primarily consumed as a reference by entry-point skills (arn-infra-wizard, arn-infra-assess) which read the ensure-config reference as Step 0 before proceeding with their workflow. | 75 Impact — No eval scenarios have been run Securityby Passed No known issues Reviewed: Version: 1fe948f | |
arn-spark-stress-competitive This skill should be used when the user says "competitive analysis", "gap analysis", "competitive gap", "stress competitive", "compare competitors", "feature comparison", "competitive stress test", "market comparison", "competitor analysis", or wants to stress-test a product concept by conducting deep competitive gap analysis with feature comparison, gap identification, and positioning assessment. Produces a competitive report with a feature matrix, per-competitor analysis, and recommended concept updates. | 93 Impact — No eval scenarios have been run Securityby Advisory Suggest reviewing before use Reviewed: Version: 1fe948f | |
arn-code-review-implementation This skill should be used when the user says "review implementation", "review the project", "check implementation", "quality review", "validate implementation", "implementation review", or wants a post-execution quality gate to verify that the implementation follows the project's stored code and testing patterns and matches the plan. Reports issues as ERRORS, WARNINGS, INFO with a verdict. Do NOT use this for reviewing PRs (use arn-code-review-pr) or validating plans (use arn-code-review-plan). | 86 Impact — No eval scenarios have been run Securityby Risky Do not use without reviewing Reviewed: Version: 1fe948f | |
arn-infra-report This skill should be used when the user says "infra report", "report infra issue", "infra broke", "arn-infra-report", "infrastructure issue", "report deployment problem", "report infrastructure problem", "diagnose infra", "infra doctor", or wants to report a problem with an Arness Infra workflow skill. Invokes the arn-infra-doctor agent to diagnose the issue, then files a GitHub issue on the Arness plugin repository. Do NOT use this for filing issues on the user's own project — use /arn-code-create-issue for that. | 90 Impact — No eval scenarios have been run Securityby Passed No known issues Reviewed: Version: 1fe948f | |
arn-spark-use-cases-teams This skill should be used when the user says "use cases teams", "arn use cases teams", "team use cases", "debate use cases", "collaborative use cases", "use cases with debate", "team-based use case review", "use case debate", "review use cases as a team", or wants to create structured use case documents through expert debate where product strategist and UX specialist review and discuss each other's findings before revising, producing a use-cases/ directory with individual Cockburn fully-dressed use case files and a README index. | 78 Impact — No eval scenarios have been run Securityby Passed No known issues Reviewed: Version: 1fe948f | |
arn-code-standard This skill should be used when the user says "standard", "standard mode", "standard implementation", "arn-code-standard", "standard change", "medium change", "standard feature", "standard fix", or wants a mid-ceremony implementation for a change that needs lightweight architectural context (spec-lite) and task-tracked execution but not the full feature-spec/plan pipeline. Bridges the gap between arn-code-swift and the full thorough pipeline. Includes spec-lite generation, structured plan, in-session execution, review-lite, and a unified change record. | 73 Impact — No eval scenarios have been run Securityby Passed No known issues Reviewed: Version: 1fe948f | |
arn-spark-visual-sketch This skill should be used when the user says "visual sketch", "arn visual sketch", "sketch directions", "explore visuals", "visual proposals", "try different looks", "design directions", "sketch the UI", "visual exploration", "compare styles", "show me options", "what could this look like", or wants to generate multiple visual direction proposals as real HTML/CSS running on the scaffolded project's dev server, iteratively selecting and refining until a final visual direction is chosen. | 71 Impact — No eval scenarios have been run Securityby Advisory Suggest reviewing before use Reviewed: Version: 1fe948f | |
arn-code-batch-merge This skill should be used when the user says "batch merge", "merge batch", "arness batch merge", "arn-code-batch-merge", "merge all PRs", "merge batch PRs", "merge the batch", "merge implemented features", "batch merge PRs", "merge open PRs", "merge all feature PRs", "combine batch PRs", "land the batch", "land all PRs", or wants to discover open batch implementation PRs, analyze them for conflicts, determine an optimal merge order, and execute merges with user-guided conflict resolution. This skill is typically invoked after arn-code-batch-implement completes and chains to arn-code-batch-simplify upon completion. | 89 Impact — No eval scenarios have been run Securityby Advisory Suggest reviewing before use Reviewed: Version: 1fe948f | |
arn-code-feature-spec This skill should be used when the user says "feature spec", "arness code feature spec", "arn-code-feature-spec", "spec this feature", "help me spec", "design this feature", "feature design", "write a spec", "create a specification", "I have an idea for a feature", "let's flesh out this feature", "decompose feature", "spec XL feature", "resume spec", "continue spec", "finish my spec", "break down feature", or wants to iteratively develop a feature idea into a well-formed specification through guided conversation with architectural analysis. For XL features with decomposition hints, creates multiple sub-feature specs with full traceability. Produces specification documents capturing WHAT to build and WHY, which then feed into plan creation. | 69 Impact — No eval scenarios have been run Securityby Passed No known issues Reviewed: Version: 1fe948f |