CtrlK
BlogDocsLog inGet started
Tessl Logo

cto-review

/cs:cto-review <plan> — Architecture and scaling interrogation. Tech debt, scaling cliffs, team scaling, build-vs-buy. Use when committing to an architecture, planning for 10x load, or weighing a rebuild against a vendor.

65

Quality

79%

Does it follow best practices?

Run evals on this skill

Adds up to 20 points to the overall score

View guide

SecuritybySnyk

The risk profile of this skill

Fix and improve this skill with Tessl

tessl review fix ./c-level-agents/skills/cto-review/SKILL.md
SKILL.md
Quality
Evals
Security

/cs:cto-review — CTO Forcing Questions

Command: /cs:cto-review <plan>

Pressure-tests architecture and engineering scaling decisions. Six questions to surface the next scaling cliff before you hit it.

When to Run

  • Before approving a major architecture change
  • Before doubling the engineering team
  • Before a build-vs-buy decision > $100K/year
  • When a system is showing reliability stress (SLOs missed)
  • Before committing to a new platform / language / DB

The Six CTO Questions

1. Scaling Cliff

Where does the current architecture break, in terms of users / requests / data volume?

  • Be specific. "It breaks at 10× current load because the primary DB writes saturate."
  • If you don't know, run a load test before deciding.

2. Tech Debt Inventory

What's the top tech debt item, what's it costing per week, and when does it become blocking?

python ../../../c-level-advisor/skills/cto-advisor/scripts/tech_debt_analyzer.py

3. Team Scaling

For each open req, what's the ramp time and contribution model?

python ../../../c-level-advisor/skills/cto-advisor/scripts/team_scaling_calculator.py

4. Build vs Buy

Why are we building this instead of buying it — and what's the 3-year TCO of each?

  • If "we want control" or "it's not that hard" — push back.
  • If the answer is "this is our core moat," build.

5. SLO / Reliability

What are the SLOs for this system and what's the current error budget burn?

  • Without an SLO, you can't reason about reliability tradeoffs.
  • See engineering/slo-architect for SLO design.

6. Security & Compliance Surface

What does this expose, and has cs-ciso-advisor signed off?

  • Architecture decisions are compliance decisions.
  • Loop in cs-ciso-advisor before commit.

Workflow

  1. Run the tech debt analyzer + team scaling calculator
  2. Define the scaling-cliff hypothesis explicitly
  3. Cross-check with cs-ciso-advisor for security implications
  4. Apply the verdict

Output Format

# CTO Review: <plan>
**Date:** YYYY-MM-DD

## Scaling Cliff
- Current capacity: <metric>
- Break point: <metric>
- Headroom: X months at current growth

## Tech Debt
- Top item: <description>
- Cost per week: $X or N eng-hours
- Blocking date estimate: <date>

## Team
- Open reqs: N
- Median ramp: X months
- Contribution model: <pairing / squad / area>

## Build vs Buy
- 3-year build TCO: $X
- 3-year buy TCO: $X
- Strategic fit: <core / context>
- Decision: BUILD | BUY

## Reliability
- SLO defined: yes / no
- Error budget burn: X% (target < Y%)

## Security
- cs-ciso sign-off: ✅ / ❌

## Verdict
🟢 SHIP | 🟡 SHARPEN | 🔴 BLOCK

## Next Steps
[3 concrete actions]

Routing

  • /cs:ciso-review — mandatory if data surface changes
  • /cs:cfo-review — for build-vs-buy > $100K
  • /cs:execute — quarterly plan
  • /cs:boardroom — for architecture pivots

Related

  • Agent: cs-cto-advisor
  • Skill: cto-advisor
  • SLO: ../../../engineering/slo-architect/

Version: 1.0.0

Repository
alirezarezvani/claude-skills
Last updated
First committed

Also appears in

alirezarezvani/claude-skills
In sync

since Aug 28, 2026

Is this your skill?

If you maintain this skill, you can claim it as your own. Once claimed, you can manage eval scenarios, bundle related skills, attach documentation or rules, and ensure cross-agent compatibility.