CtrlK
BlogDocsLog inGet started
Tessl Logo

flood-control-water-management

Use when managing large-scale water control projects, river dredging, or land drainage. Follows Yu the Great's methodology for surveying terrain, selecting transportation, developing waterways, reclaiming flooded land, and coordinating regional labor.

75

Quality

92%

Does it follow best practices?

Run evals on this skill

Adds up to 20 points to the overall score

View guide

SecuritybySnyk

Passed

No findings from the security scan

SKILL.md
Quality
Evals
Security

Flood Control and Water Management

A systematic approach to water management based on Yu the Great's methodology.

Overview

This procedure outlines methods for controlling floods, managing waterways, and reclaiming land through systematic engineering and surveying.

Steps

  1. Survey and Assessment

    • Conduct land surveys using measuring tools (准绳, 规矩)
    • Mark boundaries with wooden markers (行山表木)
    • Identify high mountains and major rivers
    • Assess terrain types for appropriate transportation methods
  2. Transportation Selection

    • Land travel: use carts (陆行乘车)
    • Water travel: use boats (水行乘船)
    • Mud travel: use sleds (泥行乘橇)
    • Mountain travel: use specialized climbing shoes (山行乘暐)
  3. Waterway Development

    • Dredge rivers to create proper channels
    • Build dams and reservoirs (陂九泽)
    • Connect waterways for drainage
    • Create irrigation channels for agriculture
  4. Land Reclamation

    • Clear obstructed waterways
    • Drain flooded areas
    • Prepare land for settlement and agriculture
    • Distribute appropriate crops based on soil conditions (e.g., rice for low-lying wet areas)
  5. Resource Management

    • Coordinate labor from regional populations
    • Balance food distribution between regions
    • Adjust supplies based on surplus and deficit areas

Expected Outcomes

  • Flooded lands become habitable and arable
  • Established transportation networks
  • Agricultural productivity restored
  • Regional coordination achieved

Validation

  • Confirm that terrain surveys using 准绳 and 规矩 were completed before waterway development began
  • Verify that reclaimed land has been assigned crops appropriate to its soil conditions
  • Check that food distribution between surplus and deficit regions is balanced and supply lines are operational
Repository
baojie/shiji-kb
Last updated
First committed

Is this your skill?

If you maintain this skill, you can claim it as your own. Once claimed, you can manage eval scenarios, bundle related skills, attach documentation or rules, and ensure cross-agent compatibility.