Groups plan phases and tasks into dependency-ordered waves for parallel subagent execution via git worktrees. Builds a task dependency DAG, assigns wave numbers via topological sort, emits a living wave document that tracks status as work lands, and updates wave progress when tasks complete. Use when asked to: group tasks into waves, plan parallel execution, schedule worktrees, create a wave breakdown, wave planning, dependency grouping, update wave statuses, parallel subagents, which tasks can run in parallel.
91%
Does it follow best practices?
Run evals on this skill
Adds up to 20 points to the overall score
Passed
No findings from the security scan
Groups tasks into dependency-ordered waves so multiple subagents can work concurrently in isolated git worktrees.
.context/plans/<plan-slug>.md| Signal | Mode |
|---|---|
| New requirements / PRD with no existing plan | Mode A |
| Existing flat plan, phase list, or task breakdown | Mode A (from existing plan) |
| Wave document exists; tasks have been completed | Mode B |
| "Which wave is unblocked?" / "Update status" | Mode B |
Input that triggers Mode A:
"Create a wave plan for this refactor. Tasks: extract lib (no deps),
scaffold CLI (needs lib), add commands A/B/C (needs CLI), cleanup (needs all commands)."Expected output skeleton:
Wave 1 (parallel): extract-lib
Wave 2 (sequential): scaffold-cli ← depends on Wave 1
Wave 3 (parallel): command-A, command-B, command-C ← depend on Wave 2
Wave 4 (sequential): cleanup ← depends on Wave 3See references/wave-format.md for output format and full examples.
parallel; a wave with 1 task (or tasks that must run in order) is sequential. Then apply the safe intermediate state check to every wave boundary: "If this wave deploys and the next has not landed yet, does any existing functionality break?" If yes, merge the tasks on both sides of that boundary into a single must land together wave — see references/dependency-analysis.md for patterns and detection guidance.<plan-slug>.md to the plans location shown in Quick Start, using the format in references/wave-format.md.See references/status-tracking.md for the full update protocol.
Verification: checklist:
# example gate for a test-coverage wave
bun run test --coverage
bun run typecheck
git log --oneline main..HEADStatus column cells.— DONE to the wave heading when all verifications pass.Pending → In Progress → Done
↓
Blocked (add a > BLOCKED: note)Each entry gives the rule, WHY it exists, then a BAD and GOOD example.
WHY: agents working in parallel worktrees assume no ordering, so placing dependent tasks together causes undefined behaviour or overwrite conflicts.
BAD: Wave 2 (parallel): scaffold-cli, add-commands where the commands need the scaffold.
GOOD: Wave 2: scaffold-cli, then Wave 3 (parallel): command-A, command-B, command-C.
WHY: parallel signals subagent tooling to spin up worktrees; a single-task wave wastes setup overhead and misleads reviewers.
BAD: Wave 1 (parallel): extract-lib.
GOOD: Wave 1 (sequential): extract-lib.
WHY: a broken merge point in production compounds into every parallel branch; early detection is always cheaper.
BAD: mark Wave 2 in progress while one Wave 1 verification check is still unticked.
GOOD: name the failing check, hold Wave 2 as pending, and tell the user what must pass first.
WHY: distributed status creates stale reads and coordination failures when multiple agents update concurrently.
BAD: add a status: done line to each phase file and treat those as the record.
GOOD: update checkboxes or the Status column in the single wave document.
WHY: fabricated ordering reduces parallelism, slows execution, and breaks the contract between the plan and the actual work.
BAD: serialise two unrelated documentation tasks because they "feel" related.
GOOD: infer only logical ordering (a test task depends on its implementation task) and leave the rest parallel.
WHY: each wave merge is a potential release point. Runtime dependencies (config values, API contracts, schema columns, env vars, permission grants, event topics) are invisible to the code-level DAG but fatal when missequenced. Three failure modes: (1) stranded consumer, a resource is removed before all code that uses it is also removed or updated; (2) premature consumer, code that requires a resource (new env var, schema column, endpoint) deploys before that resource exists; (3) breaking contract change, an interface changes incompatibly before all consumers are updated.
BAD: Wave 1 removes an SDK-backed infrastructure resource and Wave 2 updates the services that still call it.
GOOD: group tasks that must deploy atomically into a single must land together wave, or use explicit expand-contract sequencing across waves. See references/dependency-analysis.md.
WHY: agents editing the same tree overwrite each other and leave no clean merge point per workstream.
BAD: two phases in a parallel wave both commit to the same branch checkout.
GOOD: each phase in a parallel wave gets its own branch and worktree, listed in the Branch Strategy table.
WHY: "it looks right" is not a gate, and an unverified wave hides defects until the next merge.
BAD: append — DONE to the wave heading after reading the diff.
GOOD: run every command in the wave's Verification: list, tick each item, and only then mark the wave done.
WHY: a task absent from every wave is never executed, and one present in two waves is built twice.
BAD: a plan with nine tasks whose waves list eight, or list one task twice.
GOOD: validate that every task appears in exactly one wave before writing the output.